Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
16 Mar 2021, 1:00 pmClosed
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
THE WORK OF ARRESTING LEAKAGE AND REPLACEMENT OF GASKET OF 40 MVA, 132/33 TRANSFORMER (ACCURATE MAKE) AT 132 KV SUB-STATION BILARI UNDER ELECTRICITY TRANSMISSION DIVISION-I MORADABAD
2021_UPTCL_556749_1
E-T-124/ ETCM/2020-21
Open Tender
Electrical Works
Fixed-rate
60 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC MORADABAD
₹6,000
26 Mar 2021
18 Feb 2021
16 Mar 2021
18 Feb 2021
16 Mar 2021
18 Feb 2021
Amount
The Following works are to be carried out at 132KV S/S, Bilari under ETD-I, Moradabad
Carriage of oil tank 25 Kl including loading, unloading & carriage from any near place to 132 KV S/S Bilari.
Complete drain out of Transformer oil from main tank of filling in empty oil drums.
Dismantling of HV/LV/Neutral bushing turrent from transformer tank, Radiator, conservator Tank explosion vent pipe, bucholz relay oil pipe line, cooling fan opening of electricals connections & proper blanking of open space for replacement of gaskets.
Centrifuging of oil in oil tank by connecting the centrifuging pipes circulating the Transformer oil through centrifuging machine to increases BDV.
Replacement of old & damaged gasket of 40 MVA Transformer by providing new gasket as per required size of good quality rubberized cork sheet of NU COCK/ TALBROS make at required places of complete Trasnformer including top covers & accessories.
Erection of radiator, conservator tank, bushing with its turret (if available) turret HV/LV/TV/N bushing all pipe lines radiator oil conservator tank etc.
Cleaning of Core and winding by fresh Transformer oil and removed the slug from bottom.
Creating the Vacuum inside the tank for period of 12 Hrs. and filling of centrifuging oil step by step upto core & winding conservator tank radiator.
Centrifuging of oil in the transformer taking the IR/BDV value of period of 04 hrs. as per norms of transformer manufacture of till the desired values are attainted filling of centrifuging Transformer oil upto the required oil levels of transformer (Approx 20 Kl.). Centrifuging machine shall be arranged by the contractor at his own cost.
Overhauling of diverter switch after removing of oil and dirty oil from its chamber filling the fresh centrifuged transformer oil its centrifuged transformer oil its centrifuged circulation as per norms of Transformer.
Painting of 40 MVA Transformer with suitable gray paint
Replacement of Radiator valve (butterfly valve)
M/s S.S. Refregeration
Technocrat Electrical
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .