Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹20.5 L+₹22,374.20 (1.10%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
₹20.6 L
EMD Value
₹21,000
Closing Date
22 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer
BDO Office Uthangarai
Krishnagiri District Uthangarai Block Under AGAMT II 2022 - 2023 3 Works at Vellakuttai Panchayat Package No UTG AGAMT 05
2022_RDTN_272784_1
ROCNO5214_2022_R10_12_10_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
BDO Office Uthangarai
29 Dec 2022
15 Dec 2022
22 Dec 2022
15 Dec 2022
22 Dec 2022
15 Dec 2022
16 Dec 2022
Amount
1.Rejuvanation of Naickan Eri desilting, Bund strengthening inlet channel and out let channel desilting ( 50m) and Retaining Wall Construction( 10m),H/O Vellakuttai Estimate Amount : 8.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete
Construction of Retaining Wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc.
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete.
Provision for boundary stones
Provision for Name Board charges
2.Rejuvanation of Sudukadu Kulam desilting, Bund strengthening inlet channel and out let channel desilting (30m) and Retaining Wall Construction( 9m),H/O Vellakuttai Estimate Amount : 4.075 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earthwork in all soils except hard rock requiring blasting and conveying with initial lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill, breaking of clods, formation of bund, breaking clods and sectioning with extra watering to OMC and compaction of each layers to 95% of proctor density through deployment of appropriate compaction equipment (8-10 ton vibratory power roller/short width (+0.90M width drum) power roller or vibratory power roller/fuel-operated or electrical operated vibratory plate compactors ensuring compaction of designed bund section compaction complete as per technical specifications etc., complete as directed by the Departmental Officers.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete
Construction of Retaining Wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc.
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete.
Provision for boundary stones
Provision for Name Board charges
3. Construction of Threshing floor at Kamaraj Nagar ( Size 15m x 15m ) H/O Vellakuttai Estimate Amount : 8.50 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supply and fixing of MS pipe 60mm including cost and conveyance of all materials & labour charges etc., complete
Supply and fixing of hollow section of following size including cost and conveyance of all materials & labour charges etc., complete
Roofing with best quality Tuflon sheet including cost and conveyance of all materials & labour charges etc., complete
Provision For Bitumen Pad 15mm Thick
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Perumalsamy Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .