Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.1 Laccepted-aoc | ₹8.1 L | accepted-aoc |
Tender Value
₹8.2 L
EMD Value
₹8,182
Closing Date
17 Jun 2026, 1:00 pmClosed
Commissioner, Dharmapuri Municipality
Dharmapuri Municipality
Laying of HDPE pipeline with required materials including HSC at unserved areas in all wards in Dharmapuri Municipality(1 to 7 wards)
708179
E1/MCD/41/11/2026-27, Dt.8-6-2026
OPEN
Civil Engineering Works
JAGITIAL
13 documents required · 13 mandatory
₹290
₹8,182
5 Aug 2026
10 Jun 2026
11 Jun 2026
Cutting open CC road surface including stocking of excavated materials for pipeline trench work with driling machine including labour charges all operational and incidental charges etc., complete
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Carting away the surplus excavated earth from work site upto 5 km lead including loading,unloading and conveyance etc. complete.
RBR-FNDN-22: Supply and Filling with HBG Stone Chips 12mm to 14 mm size with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) For Restoration
Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.) 110mm dia pipe
Laying and Jointing of 100mm HDPE pipes by butt fusion welding as per IS :7634- Part-II/1975 as amended from time to time to the alignement and gradient and testing the pipeline to the requirement pressure
Manufacture, supply and delivery of HDPE fittings conforming to IS -4984 -1995 including transporation to any where in T.G
HDPE end Caps (110mm OD )
HDPE Tees (110mm OD )
HDPE Reducers90 mm x 110 mm
HDPE Reducers160 mm x 180 mm
Manufacture, Supply & Delivery of 20mm MDPE SDR-11 PN-12.5pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material along with all fittings, including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to any where in Telangana but excluding GST.
Lowering, Laying, jointing of 20mm PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPEpipes including earth work excavation, testing to hydraulic testpressure including cost of water with a water lead of complete, but excluding road cutting (BT/CC) charges.Complete.
Supply of tamper proof house hold non return cum flow control valve (with all three parts made by using sold steel bars of SS316) with CNC machine make and of 15mm dia designed for 5 LPM discharge @ 0.5 bar pressure loss, not exceeding the flow of 7 LPM at 1 bar pressure and working on float principle (as per CPHEEO manual) including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation but excluding GST.
Supply of 20mm x ½” PPR Female Threaded Adaptoptor conforming to DIN Standards 8077/8092
Supply of 20mm x ½” PPR Female Threaded Elbow conforming to DIN Standards 8077/8092 E
PP Clamp Saddle (90X3/4")shall comply with AS/NZS 4793 or relevant international standards-Mechanical tapping saddles for water works purposes and designed for use with PVC/PE pipe as per IS 4985/ IS 4984 respectively. These saddles should be contoured to fit around the pipe. PP Saddles shall be blue with moulded SS female threaded outlets. Seal shall be thermoplastic elastomer rubber suitable for drinking water and SS nut-bolt-washer. Maximum working pressure rating of 10 bar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ- HDPE pipeline 1-7.xlsx
TENDER_DOCUMENT • 1.04 MB
Tender Doc HDPE pipeline 1-7.doc
TENDER_DOCUMENT • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .