| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC Less ER | |
| 2 | L2₹9.4 L+₹44,732.62 (4.97%)Rejected-Finance | L2 | Rejected-Finance Above ER |
Tender Value
₹9.2 L
EMD Value
₹19,000
Closing Date
18 Jul 2023, 3:00 pmClosed
BDO(VP)
BDO,GUMMIDIPOONDI
Improvements of Burial Ground ( CC road , Compound wall Cremination shed ) at Tamil Colony in Kilmudalambedu Panchayat
2023_RDTN_340862_1
Rc2501/22/A7dt08.07.2023
Open Tender
Civil Works
Item Rate
180 days
GUMMIDIPOONDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,000
Yes
BDO,GUMMIDIPOONDI
26 Jul 2024
11 Jul 2023
18 Jul 2023
11 Jul 2023
18 Jul 2023
11 Jul 2023
12 Jul 2023
Amount
1.Improvements of Burial Ground ( CC road , Compound wall Cremination shed ) at Tamil Colony in Kilmudalambedu Panchayat
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Towards centering chargers for all labour charges etc
Supplying and fixing of Bitumen pad for expansion joints
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed..
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer including cost and conveyance and all lab our charges and materials charges completed..
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Brick Work In C.M 1:5 mix using good quality of country bricks including cost and conveyence of all materials to site and all other labour charges etc., completed.
Supplying and filling the excavated earth including cost of labour charges for filling etc., completed.(Refilling charges)
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications in all etc
Dry Brick work wall Including all labour charges as per standard specifications in all etc
Brick Work In C.M 1:5 mix using good quality of country bricks including cost and conveyence of all materials to site and all other labour charges etc., completed.
Supply and erection of steel centering for all R.C.C items of works including hire charges and labour charges for errection etc., completed. (Below Ground level)
Supply and errection of steel centering for all R.C.C items of works including hire charges and labour charges for errection etc., completed.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position.etc.complete
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Plastering with C.M 1:3 mix -10mm thick including cost and conveyence of al materials to site and all other labour charges etc., completed.
Finishing the top of roof with one course of machine pressed tiles size of 200 mm *200 mm*2mm of approved quality laid inC.M 1:3 mix including all cost of materials and labour charges etc.,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Chimney cover slab etc.., 2 -------------L.S---------------------------.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/S. SAI SABARI ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .