| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC Approved |
| 2 | L2₹10.0 LRejected-AOC | ₹10.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | I.Muthuramalingam L1 | P R Ramaraj L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 67.31 | Cum | 263.78 ₹17,755.03 | 266.42 ₹17,932.73 |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 6.88 | Cum | 5,577.81 ₹38,375.33 | 5,633.59 ₹38,759.10 |
| 1.03 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 20.56 | Cum | 9,324.38 ₹1.9 L | 9,417.62 ₹1.9 L |
| 1.04 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., BELOW GL | 110.35 | Sqm | 547.5 ₹60,416.63 | 552.98 ₹61,020.79 |
| 1.05 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., ABOVE GL | 44.72 | Sqm | 1,095 ₹48,968.40 | 1,105.95 ₹49,458.08 |
| 1.06 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,436.01 | Kgs | 91.95 ₹1.3 L | 92.87 ₹1.3 L |
| 1.07 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 29.92 | Cum | 6,159.87 ₹1.8 L | 6,221.47 ₹1.9 L |
| 1.08 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 300.66 | Sqm | 284.98 ₹85,682.09 | 287.83 ₹86,538.97 |
| 1.09 | Plastic Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall ) | 300.66 | Sqm | 262.48 ₹78,917.24 | 265.1 ₹79,704.97 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,50,870.31 ₹1.5 L | 1,52,378.92 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
11 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) PERIYAKULAM
BLOCK DEVELOPMENT OFFICER (BP) PERIYAKULAM
CONSTRUCTION OF COMPOUND WALL AT SURVEY NO 1154 WEST SIDE IN VADAPUTHUPATTI PANCHAYAT DPGF - 2025 - 2026
2026_RDTN_651466_1
4915/2026/A.4
Open Tender
Civil Works
120 days
PERIYAKULAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,000
28 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., BELOW GL
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., ABOVE GL
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastic Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_781215.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid