| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | M T Khedkar jaysingpur L1₹31,903Accepted-AOC | L1 | Accepted-AOC LOW RATE | |
| 2 | L1₹31,903Accepted-AOC | L1 | Accepted-AOC LOW RATE | |
| 3 | L1₹31,903Accepted-AOC | L1 | Accepted-AOC LOW RATE |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
14 Mar 2019, 5:00 pmClosed
Dy Eng (Mech) Sub Division Z P Kolhapur
Dy Eng (Mech) Sub Division Z P Kolhapur
Rates of various driling borewell installation of hand pump conctrction of platform
2019_KOLHA_436936_1
etender152/2018-19
Open Tender
Civil Works - Water Works
Item Rate
365 days
Kolhapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Chief Accounts and Finance Officer Z P Kolhapur
₹25,000
27 May 2025
8 Mar 2019
15 Mar 2019
8 Mar 2019
14 Mar 2019
8 Mar 2019
Amount
supply 150mm diameter DTH drilling work. Work related with 150mm diameter of borewell by DTH drilling 1) Drilling works (with transportation charges ) (soil / Murum strata burden 200/215 mm diatmeter drilling work in hard rock for 150 diameter drilling work.
After complition of borewell drilling work, by air flushing lift method taking yield test by using 90 degree V notch.
For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with socket .
For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with casing lowering, & grouting.
For 150mm diameter threaded iron casing pipe Cap.
For 150mm diameter of borewell using 150mm diameter without Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm
For 150mm diameter of borewell using 150mm diameter without Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with casing lowering, & grouting.
For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class(perfolated) (IS 1239 ) 4.8mm thick with casing lowering, socket & welding as per casing policy.
180mm diameter PVC casing pipe (6 kg/cm square ) (IS 4985-1988 ).
180mm diameter PVC casing pipe (6 kg/cm square ) (IS 4985-1988 ) with lowering , handling & grouting.
180mm diameter PVC casing pipe (8 kg/cm square ) (IS 4985-1988 ).
180mm diameter PVC casing pipe (8 kg/cm square ) (IS 4985-1988 ) with lowering , handling & grouting.
For 180mm diameter PVC casing pipe Cap.
115mm diameter DTH drilling work. Drilling works (with transportation charges ) (Soil / Murum strata burden 150mm diameter rimming drilling work in hard rock for115mm diameter drilling (wet drilling)work including all.
After complition of borewell drilling work, by air flushing lift method taking yield test by using 90 degree V notch.
For 125mm diameter of borewell Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with socket.
For 125mm diameter of borewell Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with casing lowering& grouting .
For 125mm diameter threaded iron casing pipe Cap/socket. (IS 1239 )
For 115mm diameter of borewell using 140mm diameter PVC casing pipe (4 Kg /cm square)As per IS 4985 - 1988.
For 115mm diameter of borewell using 140mm diameter PVC casing pipe (4 Kg /cm square)(with lowring & grouting.) As per IS 4985 - 1988.
For 115mm diameter of borewell using 140mm diameter PVC casing pipe (6 Kg /cm square)As per IS 4985 - 1988.
For 115mm diameter of borewell using 140mm diameter PVC casing pipe (6 Kg /cm square)(with lowring & grouting.) As per IS 4985 - 1988.
For 115mm diameter Borewell 140mm diameter PVC casing pipe Cap.
Installation of Handpump and construction of platform work -Note : - constuction of handpump platform should be done by the given schematic drawing of platform.as per unicef designe. 1)Installation of India Mark-II /India mark -III / extra deep well / VLOM 50 pump with rising pipe and connecting rod lowering in the borewell.
Excavation of platform by actual measurement
Dry rubble stone filling by actual measurement.
1:2:4 (M150) cement concret by actual measurement.
Providing and Installation of Name board (PWD DSR 2018-19 Sr.No.298 P.No.83
Borewell Redrilling 150 mm diameter borewell (maximun 3 hours)
Borewell Redrilling 115 mm diameter borewell (maximun 3 hours)
150 mm diameter borewell flushing (Air lift method) (maximun 3 hours)
115 mm diameter borewell flushing (Air lift method) (maximun 3 hours)
Transportation charges Note : - If borewell Redrilling / flushing work is more than one the distance from one to other borewell is to be continued (Max. 50 KM for one borewell
shree sai borewells
M T Khedkar jaysingpur
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .