| 3 | Admitted-Finance 3 210 PANDARAKADU KONASAMUTHIRAM POST EDAPPADI TALUK SALEM DISTRICT TAMIL NADU | EDAPPADI | SALEM | TAMIL NADU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
11 Mar 2024, 3:00 pmClosed
Block Development Officer(V.Pt)
Block Development Office
Construction of CC Road Thershing in Edamelaiyur Nadu Theru
2024_RDTN_440644_1
958/2024/B1
Open Tender
Civil Works
Item Wise
180 days
Needamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,700
Yes
12 Mar 2024
5 Mar 2024
11 Mar 2024
5 Mar 2024
11 Mar 2024
5 Mar 2024
Amount
1)CONSTRUCTION OF CEMENT CONCRETE PAVEMENT ROAD AND PIPE CULVERT AT THERUKKU NATHAM PERIYAR NAGAR IN EDAMELAIUYUR NADU THERU PANCHAYAT KM ( 0/009)
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting Shuttering and centring including cost and conveyance of all materials to site and all labour charges etc complete.
Cement Concrete : 1:3:6 with broken stone jusing 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for tarped
CONSTRCUTION OF PIPE CULVERT (SUB ESTIMATE)
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe 900 mm dia culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (NP3 Pipe)
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Nameboard
2)CONSTRUCTION OF THRESHING FLOOR AT NADU THERU HABITATION IN EDAMELAIYUR NADU THERU PANCHAYAT
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Filling with carted earth including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Supplying and fabricating and placing in position MS or RTS reinforcement works
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Tar Pad
Provision for Nameboard
3)CONSTRUCTION OF THRESHING FLOOR AT THERUKKU NATHAM HABITATION IN EDAMELAIYUR NADU THERU PANCHAYAT
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Filling with carted earth including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Supplying and fabricating and placing in position MS or RTS reinforcement works
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Tar Pad
Provision for Nameboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ILAYARAJA M
SR CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .