Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.0 LAccepted-AOC VPO DODA SHRI MUKATSAR SAHIB | ₹16.0 L | 1 | Accepted-AOC Quoted Highest among the all |
| 2 | 2₹16.0 LRejected-Finance | ₹16.0 L | 2 | Rejected-Finance L2 |
| 3 | 3₹17.0 LRejected-Finance | ₹17.0 L | 3 | Rejected-Finance L3 |
Tender Value
₹17.2 L
EMD Value
₹34,395
Closing Date
4 May 2026, 9:00 amClosed
DSCO Sri Muktsar Sahib
O/o DSCO Shri Muktsar Sahib
Earth Work for Excavation of trenches for laying of underground pipeline, lowering and jointing of 350mm, 400mm Dia RCC pipes and Fixing of AVP Risers Construction of Haudies and Pumpstand at 4 villages of district Shri muktsar Sahib.
2026_DOA_166009_3
DSWC/MKS/2025-2026/05
Open Tender
Pipe Laying Works
180 days
muktsar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹34,395
Yes
14 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
E-Tender No.:DSWC/MKS/2025-26/05
Earth Work for excavation of Trenches for laying of Under Ground Pipe Line, lowering and jointing of 350mm, 400mm, 450 mm Dia RCC Piped, fixing of AVP , Risers, Construction of Haudies and Pumpstands Etc. at Village Chak Mahabadar, Dohak/Seerwali , Husnar, Deon Khera , District Sri Muktsar sahib
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name and address of the Contractor/ Bidder
Phone Number of Contractor/ Bidder Email id of Bidder
Total Estimated Amount of Work Rs. 1719769
Quoted by Contractor/ Bidder (As percentage of Estimated Amount) %age (-/+) 0
details of work and cost
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Chak Maha badar , Sri Muktsar Sahib (C/o Harfateh Singh S/o Shivraj Singh etc. ) District Sri Muktsar Sahib
SR.No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1433.25 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1050 /Mtrs 76 Rupees Seventy Six Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 420 /Joints 162.81 Rupees One Hundred Sixty Two and Eighty One Paise Only
4 Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 571.69 Rupees Seven Hundred Fifty One and Sixty Eight Paise Only
5 Fixing of Air vent Pipes with C.C 1:2:4 5 /Air pipe 290.83 Rupees Two Hundred Ninty and Eighty Three Only
6 Jointing of Air vent Pipes 4 /Air pipe 64.92 Rupees Sixty Four and Ninty two Paise Only
Cost of Other Items
7 Sign Board (5' X 3') 1 each 3000 Rupees Three Thousand Only 3000
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Dohak/Seerwali , Sri Muktsar Sahib (C/o Sardool Singh S/o Gurmail Singh etc. ) District Sri Muktsar Sahib
Sr. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2717.542 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1830 /Mtrs 71 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 732 /Joints 205.31 Rupees Two Hundred Five and Thirty one Paise Only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (riser pipe) 9 /cut 105 Rupees One Hundred Five Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (Airvent pipe) 10 /cut 41 Rupees Forty One Only
7 Fixing of Risers & Alfa valves with C.C 1:2:4 9 /Riser & Valve 594.64 Rupees Five Hundred Ninty Four and Sixty Four Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 10 /Air pipe 279.52 Rupees Two Hundred Seventy Nine and Fifty Two Only
9 Jointing of Air vent Pipes 6 /Air pipe 63.37 Rupees Sixty Three and Thirty Seven Paise Only
10 Fixing of Pump Stand 3 /number 2885.85 Rupees Two Thousand Eight Hundred Eighty Five and Eighty Five Paise Only
Estimate of Charges for Pump Stand (1.20 X 1.20 X 1.55 m)
11 Earth work in Excavation 6.048 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only 567.18
Total Cost for Pump Stand/Riser 567.18
Cost of Other Items
20 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
Name of Work1 :- Earth work for excavation of Trenches for laying of Under Ground pipe Line, lowering and jointing of 450 mm Dia RCC Pipes, cutting of 450 mm RCC pipes for 450 mm AAV and cutting of 150mm RCC pipes for AVP, fixing of AVP, fixing of 450mm AAV, at Project at Village Husnar (C/o Lift Pump No 327075 L), Giddarbaha, District Sri Muktsar Sahib
Work-1, Part - A
SR. NO. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters as per PWD specifications. 1777.44 /cum 93.78 Rupees Ninety Three and Seventy Eight Paise
2 Lowering & Laying of 450mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 1104 /Mtr 71 Rupees Seventy One Only
3 Jointing of 450mm class NP-2 R.C.C pipes in trenches using collar joints jointed as per specifications including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge as per PWD specifications including material like Cement, Sand etc. 442 /Joints 238.06 Rupees Two Hundred Thirty Eight and Six Paise
4 Fixing of 450mm Risers & Alfa valves as per specifications including material like Cement, Sand, Bajri etc. 8 /Riser & Valve 953.73 Rupees Nine Hundred Fifty Three and Seventy Three Paise
5 Fixing of 150mm Air vent Pipes as per specifications including material like Cement, Sand, Bajri etc. 6 /Air pipe 292.47 Rupees Two Hundred Ninety Two and Forty Seven Paise
6 Jointing of 150mm Air vent Pipes as per specification including material like cement and Sand 2 /No. 64.04 Rupees Sixty Four and Four Paise
7 Earth work in Excavtion as per PWD specifications. 12.5 /cum 93.78 Rupees Ninety Three and Seventy Eight Paise
8 B.B.C 1:4:8 as per PWD specifications. 4 /cum 4200.79 Rupees Four Thousand Two Hundred and Seventy Nine Paise
9 Plain Cement Concrete 1:2:4 in flooring as per PWD specifications. 1.91 /cum 5103.67 Rupees Five Thousand One Hundred Three and Sixty Six Paise
10 Reinforced Cement Concrete 1:2:4 as per PWD specifications 0.67 /cum 8611.53 Rupees Eight Thousand Six Hundred Eleven and Fifty Three Paise
11 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth CSR 11.5 as per PWD specifications. 7.4 /cum 4443.478 Rupees Four Thousand Four Hundred Forty Three and Forty Seven Paise
12 Providing and Fixing of Steps in Houdi 5 /nos 100 Rupees One Hundred Only
13 10 mm thick cement plaster work 1:3 CSR 15.5 as per PWD specifications. 81.42 /m2 184.52 Rupees One Hundred Eighty Four and Fifty Two Paise
Total Work-1 (A +B)
14 1 /no 3000 Rupees Three Thousand Only 3000
Sign Board 5x3 feet
GRAND TOTAL (including GST)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Deon Khera , Sri Muktsar Sahib (C/o Manpreet Singh S/o Nachattar Singh etc. ) District Sri Muktsar Sahib
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1921.49 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1397 /Mtrs 76 Rupees Seventy Six Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 559 /Joints 163.16 Rupees One Hundred Sixty Two and Eighty One Paise Only
7 Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 732.41 Rupees Seven Hundred Fifty One and Sixty Eight Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 9 /Air pipe 292.29 Rupees Two Hundred Ninty and Eighty Three Only
9 Jointing of Air vent Pipes 7 /Air pipe 64.53 Rupees Sixty Four and Ninty two Paise Only
10 Fixing of Pump Stand 6 /number 2963.26 Rupees Two Thousand Nine hundred Sixty Three and Twenty Six Paise only
Cost of Other Items
11 Sign Board (5' X 3') 1 each 3000 Rupees Three Thousand Only
12 Reccariage 121.39 Per Tonne 175.65 Rupees One Hundred Seventy Five and Sixty Five Paise Only
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
nit.pdf
Tender Documents • 0.52 MB
finbid.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid