Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹7.0 L
Closing Date
2 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER, KANPUR NAGAR NIGAM
CHIEF ENGINEER OFFICE, HQ, KANPUR NAGAR NIGAM
Improvement work of Road, Drain and Footpath from Brahma Steel Chauraha to Totapurwa Toilet and 83/320 to H/o Jameel in Ward-16 Zone-05.
2026_NNKAN_1165285_1
PDDUNVY/26-27
Open Tender
Civil Works
Percentage
120 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,532
₹7.0 L
2 Jul 2026
1 Jul 2026
2 Jul 2026
1 Jul 2026
2 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in cutting or in embankment in ordinary soil excavation to be done form of regular pits not excding 1/2M. in depth and work embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by Engg. i/c.SI.No.253 | - | CUM | - | - |
| 1.02 | Earth work in excavation in trenches for foundation pipes cabel etc in ordinary soil (Loan clay or sand) including lift upto 1.5m. Lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the engineer i/c within a lead of 50m.SCH P.W.D -251 | - | CUM | - | - |
| 1.03 | Dismantaling of old interlocking including stacking of materials as directed by Engineer-in chage with in a distance of 60mt.(200feet) | - | SQM | - | - |
| 1.04 | Construction of granular sub base(GSB) by providing coarse graded material.spreading in uniform layer with mortor grader on peepared surface. Mixing by mixing place mrthod with rotovator at OMC and compacting with viberatory.roller to achieve the desired density as per ciause 401. | - | CUM | - | - |
| 1.05 | Prov./Laying 80mm thick rubber moulded interlocking tiles with sand filling incl.mat.Lab.T&P,etc all complete | - | Sqm | - | - |
| 1.06 | M-150 class brick work in 1:4 cement and coarse sand of 1.25 fineness Modulous mortar in foundation and plinth including supply of all mat.,labour and tools and plants etc required for proper completion of the work. (Item No-305(ii)) | - | Cum | - | - |
| 1.07 | Disposal of surplus earth upto 3km including loading & unloading etc all.complete. | - | CUM | 1 | - |
| 1.08 | Providing and laying in cement concrete 1:6:12 (1cement : 6 fine sand : 12 graded brick aggregate 40mm nominal size) and curing complete, including cost of formwork in foundation and floors.SI.No.273 | - | CUM | - | - |
| 1.09 | providing and laying in position specified grade of reinforced cement ,concrete, excluding the cost of centering, shuttering, finishing and reinforcement all plinth level 1:1.5:3 (1cement :2 coarse sand :4 graded stone 20mm aggregate) work. REF NO 5.1.2 | - | CUM | - | - |
| 1.1 | mild steel of iron work in plane workforcedment concret or reinforsment brick work (when not included inoverall rates) WROUGTH to required shape as necessery including binding for proper complaction of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level/(Over all Rate) 12mm to 32mm tor | 1 | Qtl | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
ULBT2.pdf
Tender Documents • 1.02 MB
BOQ_2185546.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .