Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical GRAM CHANDA ICHAK HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical DEEPURGHDA AVAS BOARD COLONY KE SAMEEP WARD NO 05 SADAR HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹99.8 L
EMD Value
₹2.0 L
Closing Date
16 Sept 2026, 5:00 pmClosed
EE RDSD HZB
EE RDSD HZB
Construction of livelihood centre for income generation and economic activities for local fruit and vegetables vendors near N H I B at Barhi Chowk
2026_RDSPL_118486_1
RDSPL/SD/HZB/23/01/2026-27
Open Tender
Civil Works
Percentage
365 days
BARHI HAZARIBAGH
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.0 L
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 92.89 | M3 | 151.82 | ₹14,102.56 |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 157.91 | Cum. | 167.33 | ₹26,423.08 |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 144.38 | Cum. | 55.28 | ₹7,981.33 |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including thick with all leads and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. | 258.19 | Cum. | 589.51 | ₹1,52,205.59 |
| 5 | Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. | 31.02 | Cum. | 5,110.26 | ₹1,58,520.27 |
| 6 | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | 131.24 | Cum. | 5,244.08 | ₹6,88,233.06 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 115.83 | Cum. | 4,598.23 | ₹5,32,612.98 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 52.12 | Cum. | 4,961.73 | ₹2,58,605.37 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level of grade 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 79.69 | sq.m | 5,218 | ₹4,15,822.42 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement of grade 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 38.67 | Cum. | 6,082.45 | ₹2,35,208.34 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_160193.xls
BOQ • 0.38 MB
Tender_Documents.pdf
Tender Documents • 1.05 MB
DOCUMENT.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .