| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹2.9 LRejected-AOC KAVANUR | VELLORE | TAMIL NADU | ₹2.9 L | L2 | Rejected-AOC Accept |
| 3 | L3₹3.0 LRejected-AOC | ₹3.0 L | L3 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | D.Meganathan L2 | A.THIYAGARAJAN L3 | DMBUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00Vellore District Constrution of Water Tank PUE School Campous in Kavasampattu Panchayat in KV Kuppam Block 15TH CFC (BP) 2025 -2026 Package no 24 | ||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete. with small sized boulders | 73.5 | cum | 261.14 ₹19,193.79 | 269.06 ₹19,775.91 | 225 ₹16,537.50 |
| 3.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 5.25 | cum | 5,599.53 ₹29,397.53 | 5,769.21 ₹30,288.35 | 5,400 ₹28,350 |
| 4.00 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site
and all labour charges etc complete. | 10.35 | cum | 6,104.54 ₹63,181.99 | 6,289.52 ₹65,096.53 | 6,200 ₹64,170 |
| 5.00 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | 32.09 | Sqm | 542.03 ₹17,393.74 | 558.45 ₹17,920.66 | 525 ₹16,847.25 |
| 6.00 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete.( Super Structure) | 3.5 | cum | 9,475.67 ₹33,164.85 | 9,762.81 ₹34,169.84 | 8,650 ₹30,275 |
| 7.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.35 | Mt | 91,056.44 ₹31,869.75 | 93,815.72 ₹32,835.50 | 88,000 ₹30,800 |
| 8.00 | Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site
and all labour charges etc complete. | 6.54 | Sqm | 326.47 ₹2,135.11 | 336.37 ₹2,199.86 | 300 ₹1,962 |
| 9.00 | Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete. | 47.11 | Sqm | 284.48 ₹13,401.85 | 293.1 ₹13,807.94 | 300 ₹14,133 |
| 10.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 74.45 | Sqm | 203.75 ₹15,169.19 | 209.93 ₹15,629.29 | 200 ₹14,890 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
17 Dec 2025, 3:00 pmClosed
The Block Development Office KV Kuppam
The Block Development Office KV Kuppam
Vellore District Constrution of Water Tank PUE School Campous in Kavasampattu Panchayat in KV Kuppam Block 15TH CFC (BP) 2025 -2026 Package no 24
2025_RDTN_629889_1
A3/676/2025 KVKM DEC 31-25
Open Tender
Civil Works
180 days
The Block Development Office KV Kuppam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
9 Jan 2026
8 Dec 2025
17 Dec 2025
8 Dec 2025
17 Dec 2025
8 Dec 2025
Amount
Vellore District Constrution of Water Tank PUE School Campous in Kavasampattu Panchayat in KV Kuppam Block 15TH CFC (BP) 2025 -2026 Package no 24
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, as per SS 20B complete. with small sized boulders
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center
R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete.( Super Structure)
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing for Plumbing
Providing for Manhole
Provision For Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
D.Meganathan (BID ID -1535556)
A.THIYAGARAJAN (BID ID -1535570)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_753252.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_753252.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid