Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹34.5 L+₹1.6 L (4.90%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹35.0 L+₹2.1 L (6.44%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹40.9 L+₹8.0 L (24.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Unbalance Additional Performance Security Not submitted as per ENIT |
Tender Value
₹38.9 L
EMD Value
₹77,800
Closing Date
27 Aug 2026, 4:00 pmClosed
XEN PWD REASI
XEN PWD REASI
CONSTRUCTION OF FOOTBRIDGE AT BAGANSAL TO BLANGI OVER SACH NALLAH BLOCK JIJ, BAGLI UNDER DISTRICT CAPEX
2026_PWDJK_320746_1
Fresh e-NIT No.36 of 2026-27 Dated 12-08-2026
Open Tender
Civil Works
Percentage
180 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN PWD REASI
₹77,800
10 Sept 2026
12 Aug 2026
29 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
12 Aug 2026 - 22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation my manual means in trenches for foundation, drains, pipes, cables etc (not exceeding 1.50m width and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth up to 1.50m including disposal of excavated earth up to 1m from cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soils. | - | - | - | - |
| 2 | All kinds of soils 75% | 1 | cum | - | - |
| 3 | Ordinary Rock 20% | 1 | cum | 1 | ₹1 |
| 4 | Hard Rock (Blasting Prohibited) 5% | - | cum | - | - |
| 5 | Hand packed stone filling including cost of stone behind R/wall | - | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal) crushed | 1 | cum | 1 | ₹1 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 1 | ₹1 |
| 8 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with HYSD High Yield Strength Deformed Bars. | 1 | kg | - | - |
| 9 | Hand packed stone filling including cost of stone behind R/wall | - | cum | - | - |
| 10 | Centering and Shuttering including strutting and propping etc and including removal of same. | - | - | - | - |
stage.html
html • 0.02 MB
finance_1067426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1067426.xls
BOQ • 0.31 MB
CorrigendumExtaneded.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .