Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.0 L
EMD Value
₹61,300
Closing Date
3 Feb 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer ENM, Jhanjra Area
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Installation 2 300KW 1400mm 2nd belt conveyor complete Drive Head in main incline including all associated job at MIC, Jhanjra Project Colliery
2025_ECL_326391_1
ECL/GM/JNR/EnM/A2/24-25/119 dated 18.01.2025
Open Tender
Miscellaneous Works
Item Rate
30 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹61,300
4 Feb 2025
23 Jan 2025
4 Feb 2025
23 Jan 2025
3 Feb 2025
24 Jan 2025
23 Jan 2025 - 30 Jan 2025
Amount
Clamping of 3nos, heavy duty clamp at top belt and bottom belt. Unlapping the 1400mm type 12 belt from drive head and driven drum
Cleaning at head and exposed the bed frame and foundation of head, exposed the loop structure verticle post.
Dismantling of 2Nos gear box CKC-450 and 2Nos Motor 300kw
Dismantling 40 mtrs structure above head gear arrangement
Dismantling of drive drum 1000x1600mm,driven drum 1000x1600mm and equalizer pinion
Dismantling the Bed frame of head gear arrangement
Dismantling the pressure drum 630x1600mm
Transport two motors at surface with MUV after dragging 50 meters on the floor
Transport two Gear Box at surface with MUV after dragging 50 meters on the floor
Transport two drum 1000x1600 at surface with MUV after dragging 50 meters on the floor
Transport three nos base frame at surface with MUV after dragging 50 meters on the floor
Transport 02 nos breakdown drum 800x1600mm at surface with MUV after dragging 50 meters on the floor
fabrication and repairing work with gas cutting and welding at fixed unit at ug
Transportation two equilizer pinion from surface and fitting the same after dragging on floor
Transport two motors from surface to installation site at ug with MUV after dragging 50 meters on the floor
Transport two Gear Box from surface to installation site at ug with MUV after dragging 50 meters on the floor
Transport two drum 1000x1600 from surface to installation site at ug with MUV after dragging 50 meters on the floor
Transport three nos base frame from surface to installation site at ug with MUV after dragging 50 meters on the floor
Fitting extra joist support and fabrication at head gear arrangement
Dismantling the fixed unit and fixed Drum 630x1600mm
Strengthing the fixed unit with joist installation and bearing change of fixed unit
Dismantle the Loop Drum 630x1600mm
Loop trolley repairing after joist of frame change as the Trolley frame get distorted
fitting of the loop drum after frabication work on loop frame
Strengthing the loop structure 4set 3 mtr each loop frame with gas cutting and welding.
Transportation of 2 set FGC 11 gear coupling loading and unloading at job site at UG
Change the gear coupling (FGC 11) both drum and gear of of 1400mm 2nd belt as the teeth of gear coupling is worn out with transportation from surface of new gear coupling set
transportation of defletor drum 400x1600mm, dragginng on the floor after unloading and fitting the same
Placing drive drum and driven drum on base frame
Placing and fitting 2 nos, of gear box and 2nos. Of Motor
Alignment of 2nos motor, gear and drums
Transportation of 4Drums Gear oil (650 litr approx) and change the same of two no gear box
fittings of 40 mtr dismantle structure above the head gear arrangement
Install additional 10 nos 219mmX1600mm pressure drum from discharge to head for belt alignment and adjustment
Lapping 1400mm type 12 belt in drive drum, driven drum and loop arrangement
02 nos of belt joint done and tension the belt
Dismantaling of 3heavy duty clamp
commissioning the belt with proper fitting tension and running
Transportation One new VCB and Installed the same after 30 mtrs dragging of the floor as controlling VCB is under breakdown
Collection of materials after gas cutting
Fabrication Dual Drive Base Frame suitable for 1400 mm belt 2 * 300KW
Collection of materials after gas cutting
Fabrication gear Base Frame suitable for 1400 mm belt 2 * 300KW
Collection of materials after gas cutting
Fabrication motor Base Frame suitable for 1400 mm belt 2 * 300KW
assembling with gear box and motor at surface for check the alignment and dismantling the same for transport to under ground
Supply of DA cylinder
Supply of Oxygen cylinder
Supply of welding Electrode
Supply of nut bolt 24x120mm
Supply of nut bolt 16x50 mm
Supply of nut bolt 30x140 mm
Civil Works
Floor blasting in stone erection of new foundation
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE (BID ID -1121720)
SWAPAN KUMAR AKHULI (BID ID -1121744)
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .