Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
15 Aug 2022, 6:00 pmClosed
EXECUTIVE ENGINEER REW DODA
OFFICE OF THE EXECUTIVE ENGINEER REW DODA
Balance Work of New type PHC Building Shamthi at Zangli Pyt Gagla Block Kastigarh (PRI Grant)
2022_RDPR_179256_32
e-NITNo36/capex of REW Doda 2022-23 DT 15.7.2022
Open Tender
Civil Works
Item Rate
90 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹12,000
23 Aug 2022
18 Jul 2022
16 Aug 2022
18 Jul 2022
15 Aug 2022
18 Jul 2022
Amount
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 20 mm nominal size) INCL ALL CARRIAGES
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) slabs suspended floors vertical beams. INCL ALL CARRIAGES
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. superstructure above plinthg upto floor v level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) INCL ALL CARRIAGES
Centering and shuttering including strutting, propping etc. and removal of form. COLUMNS
Centering and shuttering including strutting, propping etc. and removal of form. BEAMS
Centering and shuttering including strutting, propping etc. and removal of form. SLAB
Centering and shuttering including strutting, propping etc. and removal of form. EDGES
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) INCL ALL CARRIAGES
Extra for brickwork in spr. Str.
15mm Cement plaster of mix:1 : 6 ( 1 cement : 6fine sand) INCL ALL CARRIAGES
6mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 3 ( 1 cement : 3 coarse sand) INCL ALL CARRIAGES
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. INCL ALL CARRIAGES
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second kail wood
Applying priming coat: With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood)
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
dhrub singh
Khushal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .