| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.6 L+₹20,874.44 (4.75%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Dhayalan.V | M/S.RIYA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 94.6 | M2 | 8,987 ₹10,604.66 | 8,324.8 ₹9,823.26 Lowest |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 473 | M2 | 14,190 ₹16,744.2 | 11,352 ₹13,395.36 Lowest |
| 3.00 | Providing and laying BM 50mm compacted thick Dense Bituminous Macadam using 0.24cum of 26.50 – 13.20 mm, 0.25cum of 13.20-2.36 mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30 / VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5. | 23.65 | M3 | 2,24,675 ₹2,65,116.5 | 2,17,580 ₹2,56,744.4 Lowest |
| 4.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00 – 9.50 mm, 0.17cum of 9.50 - 2.36 mm and 0.26cum of 2.36mm & below with 45.27 Kgs of 60/70 bitumen &50.30kg of plastic waste from garbage collected at free of cost (Total 50.30kg) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 MORTH Rev-5. | 14.19 | M3 | 1,41,900 ₹1,67,442 | 1,34,805 ₹1,59,069.9 Lowest |
Tender Value
₹4.6 L
EMD Value
₹4,600
Closing Date
16 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Commissioner, Tambaram City Municipal Corporat
No.01,Kalaivani Street ,Rajakilpakkam,Chennai-73
Providing BT Surface Batch Work to Nellaiyappar Street , Valluvar Street , Balaji nagar North Strreet , Balaji nagar Nadu Street , VOC street
2025_DMA_581295_28
003/2025/E1
Open Tender
Civil Works
Works
90 days
Tambaram City Municipal Corporation
Providing BT Surface Batch Work to Nellaiyappar Street , Valluvar Street , Balaji nagar North Strreet , Balaji nagar Nadu Street , VOC street
2 documents required · 2 mandatory
₹0
₹4,600
21 Sept 2025
14 Jul 2025
16 Jul 2025
14 Jul 2025
16 Jul 2025
14 Jul 2025
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying BM 50mm compacted thick Dense Bituminous Macadam using 0.24cum of 26.50 – 13.20 mm, 0.25cum of 13.20-2.36 mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30 / VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00 – 9.50 mm, 0.17cum of 9.50 - 2.36 mm and 0.26cum of 2.36mm & below with 45.27 Kgs of 60/70 bitumen &50.30kg of plastic waste from garbage collected at free of cost (Total 50.30kg) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 MORTH Rev-5.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_694688.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .