| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC low |
| 2 | L2₹2.2 Cr+₹8.9 L (4.19%)Rejected-AOC NEAR LAKAR KANDA DARSHAN SINGH MC WALI GALI PREM NAGAR KOTKAPURA | SRI MUKTSAR SAHIB | PUNJAB | 151202 | ₹2.2 Cr+₹8.9 L (4.19%) | L2 | Rejected-AOC High |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
5 Dec 2023, 12:00 pmClosed
EXECUTIVE NGINEER
ROPAR CANALAND GW DIVI.WRD PB
Estimate for construction of Kanganwal Distributary RD 42040-52000
2023_WR_111365_1
43/22A/2023-24
Open Tender
Civil Works - Canal
Item Rate
120 days
MALERKOTLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹4.4 L
Yes
ROPAR
31 Dec 2024
20 Oct 2023
5 Dec 2023
20 Oct 2023
5 Dec 2023
20 Oct 2023
1 Nov 2023
Amount
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road Discharge upto 1.5 cum/s
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation in soil using hydraulic Excavator CK 90 with Hydraulic Tractors Trolley i.e cutting & loading in trolley and transporting to the embankment location with all lifts and lead.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (a) Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Dressing of earth work
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification
Providing and laying cement concrete M-15 for Sleeper in beds and side slopes below the joints of concrete lining mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications: in Sleepers
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
Cement concrete lining 60mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN COPING
Filling of construction joints with sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications : a) For 60 mm thick Slab of lining
Providing and laying LDPE 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Applying Bitumen Primer on side of Lining and top of sleeper for construction joint,etc. complete in all respects
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. 400 mm Dia Pipe
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
P & F of Distance Marks
P & F of Boundary Pillar
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with approved material
Cement concrete 1:3:6 by mechanical means
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical Specifications.
Providing and laying of filter media with granular media/stone crushed aggregates satisfying requirements laid down in clause 2504.2.2 of Morth specifications toa thickness not lesser than 600mm with smaller size towards soil and larger size towards wall
Backfilling behing abutment,wing wall and return wall complete as per drawing and technical specification sandy material
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications-RCC Grade M 20 height upto 5m with batching plant, Transit Mixer and Concrete Pump
Any Other Items
GURDEV SINGH CONTRACTOR (BID ID -524314)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .