Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAdmitted-Finance | ₹8.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.9 Cr+₹5.2 L (0.59%)Admitted-Finance | ₹8.9 Cr+₹5.2 L (0.59%) | L2 | Admitted-Finance |
| 3 | L3₹9.5 Cr+₹70.3 L (7.98%)Admitted-Finance | ₹9.5 Cr+₹70.3 L (7.98%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dogra Construction Company Pvt Ltd L3 | RK Gupta AND CO L1 | LEGEND INDIA ENVIRONMENT PROTECTION PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches (for pipes and pits) upto all depths in all classification of earth work such as pick work, jumper works saturated soil including bailing of pumping out water, blasting soft/ hard rock or chieselling where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/ soil separately and after laying, jointing and testing of pipes returning the usable soil in trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil un-usable materials as directed within all leads and lifts including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts as per the directions of Engineer-In-charge. | 43,031.1 | Per cum | 365 ₹1,57,06,351.5 Lowest | 375 ₹1,61,36,662.5 | 400 ₹1,72,12,440 |
| 2.00Laying, jointing and testing in trenches centrifugally cast (spun) Ductile iron pipes confirming to BIS 8329-2000 class K-7 (Latest with upto date amendments) in a random length of 5.50 mtrs. of following class and diameters with cement mortar lining inside duly ISI marked including cost of Tyton (push or joints) fitting including testing of joints and rubber gasket (SBR quality ) confirming to IS 92820-1989 within all leads and lifts and to the entire satisfaction of Engineer -in -Charge. (Earth work in trenches to be measured and paid for sepertely) | ||||||
| 2.01 | Ductile iron pipe 150 mm dia K7 ( Labour Rate) | 16,137 | Per Rmt. | 115 ₹18,55,755 Lowest | 200 ₹32,27,400 | 260 ₹41,95,620 |
| 2.02 | Ductile iron pipe 200 mm dia K7 ( Labour Rate) | 6,965 | Per Rmt. | 135 ₹9,40,275 Lowest | 250 ₹17,41,250 | 270 ₹18,80,550 |
| 2.03 | Ductile iron pipe 250 mm dia K7 ( Labour Rate) | 3,495 | Per Rmt. | 195 ₹6,81,525 Lowest | 300 ₹10,48,500 | 350 ₹12,23,250 |
| 3.00 | Providing and Laying D.I. Y connection class K7 jointed with S.B.R. Tyton push on joint of 150 mm dia. complete in all respects including carriage of material with in all leads and lifts of 150mm dia (K-7) | 1,652 | Each | 6,565 ₹1,08,45,380 | 4,250 ₹70,21,000 Lowest | 5,700 ₹94,16,400 |
| 4.00 | Providing and laying of D.I.plugs (Heavy Class) complete in all respects including carriage of material within all leads and lifts 150 mm Classk-7 | 1,652 | Each | 1,965 ₹32,46,180 | 1,450 ₹23,95,400 Lowest | 2,000 ₹33,04,000 |
| 5.00 | Providing & laying cement concrete of 1:4:8 (1cement: 4sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge | 398.61 | Per cum | 4,165 ₹16,60,210.65 Lowest | 4,500 ₹17,93,745 | 6,500 ₹25,90,965 |
| 6.00Providing and laying cement concrete 1:1 ½ :3 (1cement :1 ½ sand :3 stone aggregate 20 mm nominal size) and curing complete but excluding the cost of form work and reinforcement for reinforced concrete work in :- | ||||||
| 6.10 | Foundation and plinth | 230.18 | Per cum | 5,365 ₹12,34,915.7 Lowest | 8,000 ₹18,41,440 | 7,400 ₹17,03,332 |
Tender Value
Refer Docs
EMD Value
₹9.2 L
Closing Date
18 Jun 2021, 5:00 pmClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
(SH Laying, jointing and testing of DI Pipes of various dia, Construction of RCC Manhole chambers, Flushing Tank, Inspection/ Connection chamber and Restoration of Pucca streets and paths etc. for Zone-B)
2021_HPIPH_48102_1
NO. JSV/TA/E-tender/21-2202-2251 dt 03-06-2021
Open Tender
Civil Works
Item Rate
730 days
Santokhgarh Town
as per NIT
10 documents required · 10 mandatory
₹2,500
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹9.2 L
Yes
Chief Engineer Jal Shakti Vibhag Hamirpur Zone Ha
22 Jul 2021
4 Jun 2021
19 Jun 2021
4 Jun 2021
18 Jun 2021
4 Jun 2021
4 Jun 2021 - 18 Jun 2021
15 Jun 2021
Amount
Excavation in foundation trenches (for pipes and pits) upto all depths in all classification of earth work such as pick work, jumper works saturated soil including bailing of pumping out water, blasting soft/ hard rock or chieselling where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/ soil separately and after laying, jointing and testing of pipes returning the usable soil in trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil un-usable materials as directed within all leads and lifts including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts as per the directions of Engineer-In-charge.
Laying, jointing and testing in trenches centrifugally cast (spun) Ductile iron pipes confirming to BIS 8329-2000 class K-7 (Latest with upto date amendments) in a random length of 5.50 mtrs. of following class and diameters with cement mortar lining inside duly ISI marked including cost of Tyton (push or joints) fitting including testing of joints and rubber gasket (SBR quality ) confirming to IS 92820-1989 within all leads and lifts and to the entire satisfaction of Engineer -in -Charge. (Earth work in trenches to be measured and paid for sepertely)
Ductile iron pipe 150 mm dia K7 ( Labour Rate)
Ductile iron pipe 200 mm dia K7 ( Labour Rate)
Ductile iron pipe 250 mm dia K7 ( Labour Rate)
Providing and Laying D.I. Y connection class K7 jointed with S.B.R. Tyton push on joint of 150 mm dia. complete in all respects including carriage of material with in all leads and lifts of 150mm dia (K-7)
Providing and laying of D.I.plugs (Heavy Class) complete in all respects including carriage of material within all leads and lifts 150 mm Classk-7
Providing & laying cement concrete of 1:4:8 (1cement: 4sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge
Providing and laying cement concrete 1:1 ½ :3 (1cement :1 ½ sand :3 stone aggregate 20 mm nominal size) and curing complete but excluding the cost of form work and reinforcement for reinforced concrete work in :-
Foundation and plinth
Walls (any thickness but not less then 0.10 mm metres thickness attached pilasters, buttresses, plinth & string courses etc.)from top of foundation level upto floor two level including carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Columns, pillars, post and struts upto floor two level including carriage of material with in all leads and lifts as per the direction of Engineer-in-charge..
Providing and laying Cement Concrete work of 1:2:4 ( 1 cement:2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete but excluding the cost of form work and reinforcement for reinforced concrete work in for main hole chamber.
Foundation and plinth including centire arriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
in Suspended floors, roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron frames 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and Ballies, height of propping & centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ reinforced concrete & plain concrete work in:-
Foundation, footings basis of columns etc. and mass concrete.
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc.up to 200mm in thickness.including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Columns, pillars, post and struts Square, rectangular or polygonal in plan.including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Providing mild steel/ tor steel reinforcement for R.C.C work including bending, binding & placing in position complete upto floor two level including carriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Manufacturing supplying and fixing of 1000 ltrs. Capacity (having size1.00x1.00x1.00 Mtrs) MS flushing tank making with MS Sheet 3.15 mm thick cost including inlet and outlet flanged pipes with sluice valve and flushing pipes. The cost of tank should be include all cutting, welding carriage and assembling etc. with in all leads and lifts complete with the entire satisfaction of Engineer-in-Charge.
Providing and laying Cement Concrete work of 1:2:4 ( 1 cement:2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth including entire arriage of material with in all leads and lifts as per the direction of Engineer-in-charge. for Restoration of pucca streets and pucca path.
Providing RCC spun vent shaft with cowl 140 mm and 200 mm internal and external diameter respectively and top 300 mm and 450 mm internal and external diameter.including entire arriage of material with in all leads and lifts as per the direction of Engineer-in-charge.
Providing & laying cement concrete of 1:5:10 (1cement: 5sand: 10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge
Providing and fixing C.I. rungs with CC 1:2:4 ( 1 cement:2 sand:4 graded stone aggregate 20mm nominal size) in RCC work of manhole. The CC 1:2:4 measured and paid for separately. ( The weight of CI Rungs shall be not less than 4.50 kg each) including entire carriage of material with in all leads and lifts as per the direction of Engineer-in-charge
Providing and fixing SFRC manhole frame and cover confirming to Se-12952 latest with upto date amendment of following dia and class - Medium Duty
LEGEND INDIA ENVIRONMENT PROTECTION PRIVATE LIMITED
Dogra Construction Company Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .