Tender Value
₹8.7 L
EMD Value
₹26,184
Closing Date
28 Sept 2026, 6:00 pm
Executive Engineer Flood Control DIvision ANantnag
Dc Office Complex Ananatnag
Ardwani Nallah-Construction of flood protection and anti erosion work on R/S Km 18 400 mtrs to Km 18 800 Mtrs at Wagay Mohalla Waghama
2026_IFC_323799_12
e NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
15 days
Anantnag/Kulgam
As per E NIT
2 documents required · 2 mandatory
₹300
Yes
Executive Engineer Flood Control Division ANantnag
₹26,184
Yes
10 Sept 2026
10 Sept 2026
29 Sept 2026
10 Sept 2026
28 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | . | - | - | - | - |
| 1.2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan)including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil: | 327.75 | Cum | 187.3 | ₹61,387.58 |
| 1.3 | Boring with hydraulic pilling rigs with power units, providing and installing cast-in-situ single under reamed pile of specified grade concrete mix diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embeded in pile cap etc all complete (Length of pile for payment shall be measured upto the bottom of pile cap). 300 mm dia piles | 54 | meter | 2,660.75 | ₹1,43,680.5 |
| 1.4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 22.8 | Sqm | 286.35 | ₹6,528.78 |
| 1.5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 20.52 | Cum | 7,788.4 | ₹1,59,817.97 |
| 1.6 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 66.13 | Cum | 371.15 | ₹24,544.15 |
| 1.7 | Supply of Stones | 66.13 | Cum | 700 | ₹46,291 |
| 1.8 | Supply of 4mm Dia. G.I wire crates of size 16'x16' (Mesh size 4"x4") as per ISI Specification. | 3,072 | Sft. | 23 | ₹70,656 |
| 1.9 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 150.7 | Cum | 429.45 | ₹64,718.11 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Mild steel and medium tensile steel bars | 1,600 | Kg | 115.35 | ₹1,84,560 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1091234.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .