Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84.2 LAccepted-AOC | 1 | Accepted-AOC L1 Accepted | |
| 2 | 2₹85.5 L+₹1.2 L (1.48%)Rejected-Finance 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | 2 | Rejected-Finance L2 Rejected | |
| 3 | 3₹85.9 L+₹1.7 L (2.07%)Rejected-Finance 4 14 A LEMBALAKUDDI PUDUKKOTTAI DISTRICT | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 3 | Rejected-Finance L3 Rejected | |
| 4 | 4₹88.4 L+₹4.2 L (5.00%)Rejected-Finance PLOT NO 35 ASHOK NAGAR PUDUKKOTTAI 622 001 | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 622001 | 4 | Rejected-Finance L4 Rejected | |
| 5 | 5₹90.8 L+₹6.6 L (7.78%)Rejected-Finance | 5 | Rejected-Finance L5 Rejected |
| Sl No | Description | Qty | Unit | P.V.MUTHU L6 | PL.Sridhar L5 | SN. VENKATESAN L9 | PALANISAMY R L7 | RM KARUPPIAH L1 | JOHN KENNADY L4 | C PALANICHAMY L8 | R.GANESAN L3 | RRK AND CO L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.10Strengthening and Five Year Maintanance to the road from Moongithapatti Road Km 0/0-1/620 in Thulaiyanur Panchayat | ||||||||||||
| 1.20 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete | 1,944 | Sqm | 5.9 ₹11,469.6 | 5 ₹9,720 Lowest | 6.5 ₹12,636 | 5.55 ₹10,789.2 | 5.37 ₹10,439.28 | 5 ₹9,720 Lowest | 6 ₹11,664 | 5.94 ₹11,547.36 | 5.45 ₹10,594.8 |
| 1.30 | Scarifying Existing Wornout BT Surface to a Depth of 150 mm by Mechanical Means Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. | 2,029.33 | Sqm | 21.8 ₹44,239.39 | 21 ₹42,615.93 | 22 ₹44,645.26 | 21.84 ₹44,320.57 | 19.73 ₹40,038.68 Lowest | 21 ₹42,615.93 | 22 ₹44,645.26 | 20 ₹40,586.6 | 20.05 ₹40,688.07 |
| 1.40 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting. providing coffer dams, bailing out of water as per 20A | 583.2 | Cum | 131.2 ₹76,515.84 | 127 ₹74,066.4 | 135 ₹78,732 | 131.29 ₹76,568.33 | 118.62 ₹69,179.18 Lowest | 130 ₹75,816 | 132 ₹76,982.4 | 120.02 ₹69,995.66 | 120.52 ₹70,287.26 |
| 1.50Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||||||||||
| 1.60 | Km 0/0-1/0 | 564.45 | Cum | 2,106 ₹11,88,731.7 | 2,231 ₹12,59,287.95 | 2,150 ₹12,13,567.5 | 2,106.31 ₹11,88,906.68 | 1,903.05 ₹10,74,176.57 | 1,800 ₹10,16,010 Lowest | 2,110 ₹11,90,989.5 | 2,000 ₹11,28,900 | 1,933.59 ₹10,91,414.88 |
| 1.70 | Km 1/0-1/620 | 348.75 | Cum | 2,106 ₹7,34,467.5 | 2,231 ₹7,78,061.25 | 2,150 ₹7,49,812.5 | 2,106.31 ₹7,34,575.61 | 1,903.05 ₹6,63,688.69 | 1,800 ₹6,27,750 Lowest | 2,110 ₹7,35,862.5 | 2,000 ₹6,97,500 | 1,933.59 ₹6,74,339.51 |
| 1.80 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 6,088 | Sqm | 80.6 ₹4,90,692.8 | 78 ₹4,74,864 | 85 ₹5,17,480 | 80.64 ₹4,90,936.32 | 72.86 ₹4,43,571.68 | 79.2 ₹4,82,169.6 | 81 ₹4,93,128 | 70.64 ₹4,30,056.32 Lowest | 74.03 ₹4,50,694.64 |
| 1.90 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 6,088 | Sqm | 18.7 ₹1,13,845.6 | 18 ₹1,09,584 | 20 ₹1,21,760 | 18.71 ₹1,13,906.48 | 16.9 ₹1,02,887.2 Lowest | 18.45 ₹1,12,323.6 | 20 ₹1,21,760 | 17.71 ₹1,07,818.48 | 17.18 ₹1,04,591.84 |
| 2.00Providing and laying Bituminous Macadam to 50mm thick for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using | ||||||||||||
Tender Value
₹94.6 L
EMD Value
₹95,000
Closing Date
21 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA., PUDUKKOTTAI
Package No. 28 - Thirumayam Panchayat Union - Strengthening and Five Year Maintanance to the road from Moongithapatti Road Km 0/0-1/620 in Thulaiyanur Panchayat Under NABARD RIDF XXX-2024-25
2024_RDTN_515116_1
PDKT/DRDA/NABARD/28
Open Tender
Civil Works - Roads
Item Rate
180 days
THIRUMAYAM
Please refer tender document
4 documents required · 4 mandatory
₹0
₹95,000
DRDA PUDUKKOTTAI
7 Aug 2025
28 Dec 2024
21 Jan 2025
28 Dec 2024
21 Jan 2025
28 Dec 2024
7 Jan 2025
Amount
Strengthening and Five Year Maintanance to the road from Moongithapatti Road Km 0/0-1/620 in Thulaiyanur Panchayat
Clearing the Scrub jungle including all labour charges for burryingng and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete
Scarifying Existing Wornout BT Surface to a Depth of 150 mm by Mechanical Means Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting. providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Bituminous Macadam to 50mm thick for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site ete.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and fixing Name board Cum Citizen Board
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bitumunous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200m Stone (Precast)
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RRK AND CO (BID ID -1229392)
R.GANESAN (BID ID -1230857)
JOHN KENNADY (BID ID -1229574)
PL.Sridhar (BID ID -1228711)
P.V.MUTHU (BID ID -1228265)
PALANISAMY R (BID ID -1229470)
C PALANICHAMY (BID ID -1231124)
SN. VENKATESAN (BID ID -1230778)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .