Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹7,285.10 (3.03%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹14,570.20 (6.06%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,840
Closing Date
28 Jul 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of lane tile work near the H O Janak raj, Mohan Lal, Lippa ram W.No.3 Kharah Tiles/drain work in the lane of Krishan Lal, Ex ZEO, Ward 08 Chhajwal pyt kharah block kharah balli under the scheme capex budget pri plan for the year 2026 2
2026_RDPR_316334_4
e-NIT No. 160 REWJ of 2026-27 dated 16-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Rural Development and Panchayati Raj
₹4,840
Yes
14 Aug 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL | 17.82 | CUM | 479.3 | ₹8,541.13 |
| 2 | P/L CEMENT CONCRETE OF 1 5 10 MIX EXCL THE COST OF CENTERING AND SHUTTERING ALL COMPLETE WITH 40MM NOMINAL AGGREGATES | 6 | CUM | 4,826.5 | ₹28,959 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX with 20mm nominal aggregates all complete. | 15.09 | CUM | 5,733.6 | ₹86,520.02 |
| 4 | SUPPLY AND FILLING OF STONES | 6.47 | CUM | 900 | ₹5,823 |
| 5 | CENTERING AND SHUTTERING INL PROPPING , REMOVAL OF FORMWORK. | 48 | SQM | 286.35 | ₹13,744.8 |
| 6 | Excavating, supplying and filling of local earth including royality in AKOS | 16.2 | CUM | 276.6 | ₹4,480.92 |
| 7 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 98 | SQM | 816.15 | ₹79,982.7 |
| 8 | SAND FOR 10 KM | 9.98 | CUM | 279.04 | ₹2,784.82 |
| 9 | AGG FOR 15 KM | 19.96 | CUM | 344.49 | ₹6,876.02 |
| 10 | STONES FOR 10 KM | 6.47 | CUM | 328.31 | ₹2,124.17 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1031174.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .