Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.0 CrAccepted-Finance S 05 06 2ND FLOOR HAWARE CENTURION NEAR SEAWOODS STATION SECTOR 19A NERUL E NAVI MUMBAI 400706 | ₹64.0 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹67.6 CrAccepted-Finance | ₹67.6 Cr | L2 | Accepted-Finance Accepted |
| 3 | L3₹74.0 CrAccepted-Finance | ₹74.0 Cr | L3 | Accepted-Finance Accepted |
Tender Value
₹61.5 Cr
EMD Value
₹71.5 L
Closing Date
16 May 2024, 2:30 pmClosed
Executive Engineer, PWD, WD-II, Diu
Executive Engineer, PWD, WD-II, Fort Road, Diu
Capital Dredging and Reclamation Works at Diu
2024_DIUDT_3470_1
e-Tender Notice No. 85/2023-24
Open Tender
Civil Works - Others
365 days
Diu
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Executive Engineer, PWD, WD-II, Diu
₹71.5 L
Executive Engineer, PWD, WD-II, Diu
23 Sept 2024
6 Mar 2024
16 May 2024
6 Mar 2024
16 May 2024
6 Mar 2024
16 Mar 2024
Amount
Works
Mobilization
De-Mobilization
Dredging Rate for all kinds of soil(s) and rocks as per the details provided in the tender. About 70% of dredged soil shall be disposed offshore and about 30% of dredged soil shall be used for reclamation at Diu
Standby Cost of Equipment and manpower per day or pro-rata (The standby cost shall be paid only on the list of equipment and manpower proposed to be deployed by the bidder in the bid submission document Deductions shall be made for the shortfall in Equipment and Manpower. No addition idle time shall be paid in case of the bidder deploys excess deployment over and above the proposed equipment’s and manpower at the time of bidding
Environmental Monitoring for 12 Months
Dharti Dredging and Infrastructure limited
SAHARA DREDGING LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid