| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94,600Accepted-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-AOC Being the lowest | |
| 2 | L2₹96,100+₹1,500 (1.59%)Rejected-AOC BHAGWATI NAGAR JAMMU | L2 | Rejected-AOC Not the lowest | |
| 3 | L3₹96,900+₹2,300 (2.43%)Rejected-AOC BHAGWATI NAGAR JAMMU | L3 | Rejected-AOC Not the lowest |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
14 Jul 2023, 1:00 pmClosed
Executive Engineer Mechanical Division RTIC Jammu
RTIC Mechanical Division Canal Road Jammu
Providing and fitting of 400 HP / 300 KW GEC make 3 phase induction motor of unit no 4 installed / fitted inside pump house at LIS Raya
2023_IFC_219089_1
Short e NIT MDJ/RTIC/13 of 23-24 dt 28-06-2023
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Yes
Executive Engineer Mechanical Division RTIC Jammu
₹2,000
Yes
Executive Engineer Mechanical Division RTIC Jammu
4 Sept 2023
28 Jun 2023
15 Jul 2023
29 Jun 2023
14 Jul 2023
2 Jul 2023
1 Jul 2023
Amount
Providing and fitting of 400HP/300KW GEC make 3 phase induction motor of unit no 4 installed / fitted inside pump house at Raya lift irrigation station by way of disconnecting of power connections thereafter dismantling the motor from the base frame as well as decoupling it from the pump. Shifting of motors from LIS Raya to workshop with the help of mechanical transport and unloading the same at workshop carefully with the help of crane.Disconnecting rotor and stator connecting leads of slip ring assembly and then dismantling the old / flashed slip ring assembly with the help of suitable tools and tackles.Providing& fitting of newslip ring assembly with proper alignment as per sample along with carbon brush set(set has 12 carbon brushes) and carbon brush holders / brackets 06 no. Connecting the slip ring assembly with the stator and rotor connecting leads by new suitable thimbles. Connections to be made firm and tight to avoid any chances of heating and sparking due to loose connections.Cleaning of bearings with kerosene oil and greasing the bearings properly. Shifting back to the LIS Raya after testing on no load at workshop.Making proper alignment of motor with pump and connecting with all cables properly. Testing of motors on full load.Complete job includes cost of material, transportation charges, labour charges skilled and un-skilled including charges for tools and tackles required for execution of job.
PERFECT ELECTRICAL WORKS
M/S FASTTRACK ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .