Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical MINJACHAK BALSHNABNAGAR BEDRABAD MALDA WB 732210 | MALDA | MALDA | WEST BENGAL | 732210 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
23 Sept 2026, 1:00 pmClosed
Executive Engineer_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
REMOVING BLUE SCOPE SHEET ALONG THE SIDE OF J.L NEHARU ROAD AT ELLIOT PARK IN WARD NO. 63, BR.-VII.
2026_KMC_1040452_1
KMC/EE_PS/ELLIOT/26-27
Open Tender
CIVIL WORKS
Percentage
8 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5,000
25 Sept 2026
3 Sept 2026
25 Sept 2026
5 Sept 2026
23 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 550 | EA | 269.5 | ₹1,48,225 |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 24)Welder. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 80 | EA | 358.6 | ₹28,688 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 25)Welder (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 120 | EA | 325.6 | ₹39,072 |
| 4 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate | 150 | MTR | 213 | ₹31,950 |
| 5 | Sub Total | - | - | - | - |
| 6 | GST 0% | 1 | Nos. | - | - |
| 7 | CESS 0% | 1 | Nos. | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Ten_and_dec.pdf
Additional Documents • 0.70 MB
BOQ_2554963.xls
BOQ • 0.28 MB
Ten_Doc.pdf
Tender Documents • 0.97 MB
SPE_CON.pdf
Additional Documents • 0.54 MB
Date_Corri.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .