Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Finance | -43.11% | ₹39.1 L | L1 | Admitted-Finance |
| 2 | L2₹43.8 L+₹4.6 L (11.9%)Admitted-Finance | -36.36% | ₹43.8 L+₹4.6 L (11.9%) | L2 | Admitted-Finance |
| 3 | L3₹48.1 L+₹9.0 L (23.0%)Admitted-Finance | -30.00% | ₹48.1 L+₹9.0 L (23.0%) | L3 | Admitted-Finance |
| 4 | L4₹49.3 L+₹10.2 L (26.0%)Admitted-Finance R O S K BRIDGE TEHSIL HAVELI DISTRICT POONCH | POONCH | JAMMU AND KASHMIR | 185101 | -28.33% | ₹49.3 L+₹10.2 L (26.0%) | L4 | Admitted-Finance |
| 5 | L5₹49.5 L+₹10.4 L (26.6%)Admitted-Finance | -28.00% | ₹49.5 L+₹10.4 L (26.6%) | L5 | Admitted-Finance |
Tender Value
₹68.8 L
EMD Value
₹1.7 L
Closing Date
9 May 2026, 5:00 pmClosed
office of the Executive Engineer PMGSY Div MDR
office of the Executive Engineer PMGSY Div MDR
Please Refer in BOQ
2026_JKRRD_147469_4
EE/PMGSY/MDR/04 OF 2026-27 DT. 02.05.2026
Open Tender
CIVIL
Percentage
60 days
Mendhar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
office of the Executive Engineer PMGSY Div MDR
₹1.7 L
Yes
12 May 2026
4 May 2026
11 May 2026
4 May 2026
9 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Permanent Restoration of road from Km 6th of T05 (Mankote KG Road) to Salotri Pkg No.:- JK11-114 Length :-4.00 km | |||||
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | Cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 1.03 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete Cement mortar 1:6 (1 Cement : 6 coarse sand) | 1 | Cum | 1 | ₹1 |
| 1.04 | Dry random rubble masonry with hard stone in foundation and plinth:
(1) With bond stone. | 1 | Cum | 1 | ₹1 |
| 1.05 | Providing and laying damp-proof Course/ coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | - | Sqm | - | - |
| 1.06 | Back Filling behind R/wall Abutment Wing wall Retaining wall with available stone from earthwork completed as per drawing and techinical specification clause 1204.3.8 labour rate (50% Earth & 50% Stone) | 1 | Cum | 1 | ₹1 |
| 1.07 | A) Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | - | Sqm | - | - |
| 1.08 | B) Centering and shuttering including strutting, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | - | Sqm | - | - |
| 1.09 | Carriage of Sand for an average distance of 22 km by MT | 1 | Cum | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_230026.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .