Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3,958.27Admitted-Finance | -29.22% | ₹3,958.27 | L1 | Admitted-Finance |
| 2 | L2₹4,724.98+₹766.71 (19.4%)Admitted-Finance | -15.51% | ₹4,724.98+₹766.71 (19.4%) | L2 | Admitted-Finance |
| 3 | L3₹5,033.12+₹1,074.85 (27.2%)Admitted-Finance | -10.00% | ₹5,033.12+₹1,074.85 (27.2%) | L3 | Admitted-Finance |
| 4 | L4₹5,033.68+₹1,075.41 (27.2%)Admitted-Finance | -9.99% | ₹5,033.68+₹1,075.41 (27.2%) | L4 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
18 Aug 2026, 11:00 amClosed
Executive Engineer PHED City Dn. Barmer
Executive Engineer PHED City Dn. Barmer
Annual Rate Contract for Reparing of Starter and Pannal at Various Pump Houses Under Rural Sub Dn. I Barmer
2026_PHCJO_587225_5
2026-27/27
Open Tender
Civil Works - Water Works
Percentage
365 days
Barmer
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer PHED City Dn. Barmer
₹20,000
Yes
31 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing electric fault in wiring / making connection through lugs (with the help of cramping tool) of motor pump set with starter at headworks of water supply scheme/Tubewell/ openwell including cost of insulation tape etc.. | 1 | each | 350 | ₹350 |
| 2 | Labour charges for replacement of defective ampere meter / volt meter with new one on existing panel board in pump house./Tubewell /openwell (new voltmeter/ampere meter will be provided by department | 1 | each | 192.37 | ₹192.37 |
| 3 | Labour charges for repairing of starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) 5 to 15 HP. | 1 | each | 251.69 | ₹251.69 |
| 4 | 16 to 30 HP. | 1 | each | 291.53 | ₹291.53 |
| 5 | 31 to 60 HP. | 1 | each | 315.25 | ₹315.25 |
| 6 | 61 to 100 HP. | 1 | each | 315.25 | ₹315.25 |
| 7 | 101 to 150 HP. | 1 | each | 331.36 | ₹331.36 |
| 8 | Labour charges for repairing of soft starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) 5 to 15 HP. | 1 | each | 361.02 | ₹361.02 |
| 9 | 16 to 30 HP. | 1 | each | 446.61 | ₹446.61 |
| 10 | 31 to 60 HP. | 1 | each | 628.81 | ₹628.81 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
BOQ_1044107.xls
BOQ • 0.29 MB
5.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .