Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
7 Sept 2026, 3:00 pm
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Construction of Sidewall Raising and Cover Slab at Sannathi Theru in Ward No.27
2026_MAWS_696152_1
104/2026-27/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Construction of Sidewall Rai
Registered Contractor
3 documents required · 3 mandatory
₹0
₹4,700
20 Aug 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Sidewall Raising and Cover Slab | |||||
| 1.01 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., with all cross bracings using mild steel sheets of size 90mm x60mmx10gauge stiffened into welded mild steel angles of size 25mmx6mm for boarding laid over silver oak (Country wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) | 140 | m2 | - | - |
| 1.02 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 32 | m3 | - | - |
| 1.03 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.-75mm Thick | 69 | m2 | - | - |
| 1.04 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 470 | kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
BOQ_836954.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].