| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹93.4 L+₹98,765.80 (1.07%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹93.7 L+₹1.2 L (1.35%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹94.7 L+₹2.3 L (2.48%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹94.9 L+₹2.5 L (2.71%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gyana Ranjan Mohanty L7 | SUSANTA KUMAR SWAIN L9 | Ms Gangadhar Jena L6 | JISHU KRISHNA NAYAK L1 | Aakar Engineers and Contractors L15 | SANJAY KUMAR UPADHYAY L10 | M/s.Bula Bilash Construction L4 | M/S BHAIRAB CHARAN SWAIN L5 | Maa Dakhinakali Enterprisers L3 | Skater Infratech India Pvt. Ltd. L13 | M/s. P N Construction L8 | Nilamani Swain L2 | M/S TRIBHUBAN DAS L12 | LAXMIDHAR ROUT L11 | M/S SHRI RUDRAM TECHNOCRATS PRIVATE LIMITED L16 | M.K.Groups L14 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing R.C.C. drain / walls / raft, beams, slab, including stacking the useful materials for reuse and removing the debris with initaial lead and lift of supply of all labour, T&P, staging, port entry fees, etc. complete cleaning the debrises with all taxes, including initial lead & lift transportation & disposing at specified place but excluding cost of GST as per direction of Engineer-in-charge. | 163.99 | Each Cum | 800 ₹1,31,194.4 | 650 ₹1,06,595.45 | 800 ₹1,31,194.4 | 800 ₹1,31,194.4 | 1,100 ₹1,80,392.3 | 1,255.19 ₹2,05,842.37 | 350 ₹57,397.55 Lowest | 1,000 ₹1,63,993 | 900 ₹1,47,593.7 | 1,589 ₹2,60,584.88 | 800 ₹1,31,194.4 | 600 ₹98,395.8 | 470 ₹77,076.71 | 1,800 ₹2,95,187.4 | 2,500 ₹4,09,982.5 | 1,177.25 ₹1,93,060.76 |
| 2.00 | Engagement of Tractor at required locations inside prohibited area for shifting of excavated/dismantled material and debrises, shifting to the designated debrish yard with supply of all labour, T&P, engagment, hire & running charges, transportation charges, Operator cost, Port entry fee etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge.
(No idle charges will be paid). | 120 | Each Hour | 50 ₹6,000 | 480 ₹57,600 | 100 ₹12,000 | 200 ₹24,000 | 400 ₹48,000 | 206 ₹24,720 | 130 ₹15,600 | 130 ₹15,600 | 250 ₹30,000 | 20 ₹2,400 Lowest | 80 ₹9,600 | 250 ₹30,000 | 400 ₹48,000 | 306 ₹36,720 | 400 ₹48,000 | 203.55 ₹24,426.36 |
| 3.00 | Earthwork in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P,Port entry fee,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 1,121.1 | Each Cum | 80 ₹89,688 | 120 ₹1,34,532 | 160 ₹1,79,376 | 100 ₹1,12,110 | 110 ₹1,23,321 | 215.44 ₹2,41,529.78 | 85 ₹95,293.5 | 70 ₹78,477 Lowest | 145 ₹1,62,559.5 | 140 ₹1,56,954 | 120 ₹1,34,532 | 110 ₹1,23,321 | 85 ₹95,293.5 | 108 ₹1,21,078.8 | 200 ₹2,24,220 | 208.33 ₹2,33,558.76 |
| 4.00 | Filling in foundation and plinth with excavated materials including watering and ramming etc all complete including supply of all material , labour , T&P, Port entry fee,hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC. | 747.4 | Each Cum | 50 ₹37,370 | 120 ₹89,688 | 70 ₹52,318 | 90 ₹67,266 | 90 ₹67,266 | 119.78 ₹89,523.57 | 65 ₹48,581 | 30 ₹22,422 | 90 ₹67,266 | 10 ₹7,474 Lowest | 50 ₹37,370 | 50 ₹37,370 | 220 ₹1,64,428 | 54 ₹40,359.6 | 170 ₹1,27,058 | 114.94 ₹85,909.15 |
| 5.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes,Port entry fee, etc. complete but excluding cost of GST as directed by Engineer-in-charge. | 94.95 | Each Cum | 3,800 ₹3,60,810 | 4,890 ₹4,64,305.5 | 2,900 ₹2,75,355 Lowest | 3,400 ₹3,22,830 | 5,700 ₹5,41,215 | 4,205.58 ₹3,99,319.82 | 4,900 ₹4,65,255 | 4,800 ₹4,55,760 | 3,800 ₹3,60,810 | 4,889 ₹4,64,210.55 | 4,200 ₹3,98,790 | 4,000 ₹3,79,800 | 4,370 ₹4,14,931.5 | 4,500 ₹4,27,275 | 6,000 ₹5,69,700 | 4,247.25 ₹4,03,276.39 |
| 6.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage,Port entry fee royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 572.82 | Each Cum | 5,000 ₹28,64,115 Lowest | 5,900 ₹33,79,655.7 | 5,600 ₹32,07,808.8 | 5,200 ₹29,78,679.6 | 7,100 ₹40,67,043.3 | 5,777.67 ₹33,09,582.26 | 5,900 ₹33,79,655.7 | 5,800 ₹33,22,373.4 | 5,200 ₹29,78,679.6 | 6,189 ₹35,45,201.55 | 5,700 ₹32,65,091.1 | 5,500 ₹31,50,526.5 | 6,435 ₹36,86,116 | 7,200 ₹41,24,325.6 | 6,300 ₹36,08,784.9 | 6,043.39 ₹34,61,795.08 |
| 7.00 | Supplying TOR/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes,Port entry fee, etc. all completebut excluding GST as per the direction of Engineer-in-charge.
NB: No payment shall be made for extra weight than theoretical co-efficient. | 687.39 | Each Quintal | 8,000 ₹54,99,120 | 7,278 ₹50,02,824.42 | 7,200 ₹49,49,208 | 6,800 ₹46,74,252 | 8,500 ₹58,42,815 | 6,292.57 ₹43,25,449.69 Lowest | 7,200 ₹49,49,208 | 6,900 ₹47,42,991 | 6,500 ₹44,68,035 | 7,189 ₹49,41,646.71 | 6,800 ₹46,74,252 | 6,500 ₹44,68,035 | 7,500 ₹51,55,425 | 6,638.4 ₹45,63,169.78 | 9,000 ₹61,86,510 | 7,186.35 ₹49,39,825.81 |
| 8.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties,Port entry fee, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge | |||||||||||||||||||
| 8.01 | F & P | 191.35 | Each Sqm | 100 ₹19,135 | 198 ₹37,887.3 | 120 ₹22,962 | 100 ₹19,135 | 350 ₹66,972.5 | 95.67 ₹18,306.45 | 145 ₹27,745.75 | 220 ₹42,097 | 80 ₹15,308 Lowest | 320 ₹61,232 | 500 ₹95,675 | 110 ₹21,048.5 | 250 ₹47,837.5 | 358.2 ₹68,541.57 | 280 ₹53,578 | 88.47 ₹16,928.73 |
| 8.02 | RCC Wall | 2,538.9 | Each Sqm | 270 ₹6,85,503 | 278 ₹7,05,814.2 | 350 ₹8,88,615 | 300 ₹7,61,670 | 280 ₹7,10,892 | 667.1 ₹16,93,700.19 | 145 ₹3,68,140.5 Lowest | 220 ₹5,58,558 | 390 ₹9,90,171 | 389 ₹9,87,632.1 | 450 ₹11,42,505 | 340 ₹8,63,226 | 250 ₹6,34,725 | 358.2 ₹9,09,433.98 | 450 ₹11,42,505 | 713.83 ₹18,12,330.29 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
12 Jun 2023, 5:15 pmClosed
Binayak Pradhan,EE,HWDII,PPA
Binayak Pradhan,EE,HWDII,PPA
Repair and renovation of drain and retaining wall inside the harbour area.
2023_MoS_754368_1
CE/ HW-II-W-23/22/117
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹3,000
Yes
As per Tender Document and e-TCN
₹2.5 L
Yes
22 Aug 2023
22 May 2023
14 Jun 2023
22 May 2023
12 Jun 2023
22 May 2023
Amount
Dismantling and removing R.C.C. drain / walls / raft, beams, slab, including stacking the useful materials for reuse and removing the debris with initaial lead and lift of supply of all labour, T&P, staging, port entry fees, etc. complete cleaning the debrises with all taxes, including initial lead & lift transportation & disposing at specified place but excluding cost of GST as per direction of Engineer-in-charge.
Engagement of Tractor at required locations inside prohibited area for shifting of excavated/dismantled material and debrises, shifting to the designated debrish yard with supply of all labour, T&P, engagment, hire & running charges, transportation charges, Operator cost, Port entry fee etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid).
Earthwork in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P,Port entry fee,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Filling in foundation and plinth with excavated materials including watering and ramming etc all complete including supply of all material , labour , T&P, Port entry fee,hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC.
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes,Port entry fee, etc. complete but excluding cost of GST as directed by Engineer-in-charge.
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage,Port entry fee royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
Supplying TOR/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes,Port entry fee, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties,Port entry fee, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge
RCC Wall
Drilling of 200 mm deep holes on concrete surface in horizontal plane for fixing 12mm or more dia reinforcement bars by any approved method, cleaning the hole by blow out pump, grouting the reinforcement bars with approved anchoring adhesive resins of HILTIMAKE HIT- HY 150/ BOSCH or equivalent make, transporting, cutting, placing, proper fixing of reinforcement bars with cost & expenses of all materials, tools and plants, machineries, taxes, Port entry fees including providing barricades to the working area etc all complete but excluding cost of G.S.T as per direction of Engineer in charge. NB: Excluding cost of steel reinforcement and bending,binding charges.
Engagement of 5HP Diesel Pump sets and placing those pumps at required locations inside prohibited area for dewatering of stagnated water by pumping including fuel and consumable, providing required length of suction and delivery pipes with supply of all labour, T&P, engagment, hire & running charges of Pump, transportation charges, tollage, Operator cost, Port entry fee with barricading the same area if required etc. including all taxes excluding G.S.T all complete as directed by Engineer-in-charge. (No idle charges will be paid. Pumps will be engaged as and when required).
Nilamani Swain
Maa Dakhinakali Enterprisers
M/s.Bula Bilash Construction
M/S BHAIRAB CHARAN SWAIN
Ms Gangadhar Jena
Gyana Ranjan Mohanty
M/s. P N Construction
SUSANTA KUMAR SWAIN
SANJAY KUMAR UPADHYAY
LAXMIDHAR ROUT
M/S TRIBHUBAN DAS
Skater Infratech India Pvt. Ltd.
M.K.Groups
Aakar Engineers and Contractors
M/S SHRI RUDRAM TECHNOCRATS PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_793051.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .