| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 CrAccepted-AOC | ₹13.0 Cr Quoted ₹10.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.5 Cr+₹2.3 Cr (22.1%)Rejected-Finance | ₹12.5 Cr+₹2.3 Cr (22.1%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹13.1 Cr+₹2.9 Cr (28.1%)Rejected-Finance KHALINI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹13.1 Cr+₹2.9 Cr (28.1%) | L3 | Rejected-Finance Due to L3 |
Tender Value
Refer Docs
EMD Value
₹31.1 L
Closing Date
26 Dec 2025, 5:00 pmClosed
Superintending Engineer
11th Circle, HP.PWD., Rampur Bushahr District Shimla HP
SH C.O F.C. Parotection wroks CD work U and V shape drain, unlined surface drain, WBM G III BC road safety works dumping structure and bridge rilling including five year routine maintenance XXXI
2025_PWD_123749_1
I/744468/2025 dated 11.12.2025
Open Tender
Civil Works - Roads
Percentage
365 days
Kumarsain
Please refer Tender documents.
26 documents required · 26 mandatory
₹20,000
₹31.1 L
13 Apr 2026
19 Dec 2025
27 Dec 2025
19 Dec 2025
26 Dec 2025
19 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD 2014 technical specification Clause 1603.1, 1603.2 section 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones that tune of 14385.30 Cum quantity ( Fourteen thousand three Hundred eighty five point thirty) cubic metres at the rate of 300/- (Rupees three hundred ) per cubic metre shall be effected from the contractor's running bills on pro-rate basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. | 1 | Per cubic meter | 227.95 | ₹227.72 |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | - | Per cubic meter | 83.05 | - |
| 3Earth work in excavation for all type of road structure such as retaining walls, Breast walls, culverts, drainds and parapets etcetra. in all types of classification of soil comprising of ordinary soil ,ordinary rock and hard rocks, chiselling/wedging out of rock (where blasting is prohibited) as per drawing and MORD 2014 Technical specifications Clause 305, 1101.4, 1603.4 section 300 & 1600 and as per direction of Engineer in Charge including setting out, shoring and bracing, removal of stumps and other deleterious material and disposal of material up to any lead and upto any lift, including dressing of sides and bottom and back filling in trenches with excavated suitable material to the orignal surface in layers not exceeding 150 mm (one hundred fifty milimeters) compected thickness including sorting and sturting and pumping and bailing out water (surface and sub soil water) up to all depth or any quantum of water including cleaning of slush which may arise out during dewatering . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST including hauling of materials in all leads and lifts as per entire satisfaction | |||||
| 3.01 | Protection Work | - | Per cubic meter | 504.15 | - |
| 3.02 | RCC Slab Culvert | 1 | Per cubic meter | 504.15 | ₹503.65 |
| 3.03 | Hume Pipe Culvert (New) | - | Per cubic meter | 504.15 | - |
| 3.04 | Hume Pipe Culvert (Repair) | - | Per cubic meter | 504.15 | - |
| 3.05 | Box Culvert | 1 | Per cubic meter | 504.15 | ₹503.65 |
| 3.06 | Road Side Drain | 1 | Per cubic meter | 504.15 | ₹503.65 |
| 3.07 | Crash Barrier | - | Per cubic meter | 504.15 | - |
stage.html
html • 0.05 MB
technical_181811.pdf
techsummary_181811.pdf
finance_181811.pdf
BOQ Comparative Chart
xlsx
finsummary_181811.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.21 MB
SBDOddiBithalroadNABARD.pdf
Tender Documents • 1.63 MB
BOQ_181811.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .