| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 L+₹6,221 (1.50%)Rejected-Finance | ₹4.2 L+₹6,221 (1.50%) | L2 | Rejected-Finance not L1 |
| 3 | L3₹4.3 L+₹18,663 (4.50%)Rejected-Finance | ₹4.3 L+₹18,663 (4.50%) | L3 | Rejected-Finance not L1 |
Tender Value
₹4.1 L
EMD Value
₹8,500
Closing Date
16 Feb 2026, 2:00 pmClosed
E.E.tubewell
5, S N Banerjee Road, Kolkata-700013
SINKING OF 10 NOS. SMALL DIA. HAND TUBEWELL IN DIFFERENT WARDS OF BOROUGH-X
2026_KMC_1000403_1
KMC/TW/EE/25-26/N/X/09/1st Call
Open Tender
MECHANICAL
Percentage
90 days
Different location of Br-X
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,500
Yes
12 Aug 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
16 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | LABOUR FOR BORING TUBE WELL OF REQUIRED DIA BY WATER JET SYSTEM THROUGH ANY TYPE SOIL STRATA INCLUDING HIRE AND LABOUR CHARGES FOR BORING PIPES SCAFFOLDING TOOLS AND PLANTA AS NECESSARY AND TAKING OUT THEM AND LOWERING PIPES STRAINER BLIND PIPE ETC. AND FITTING AND FIXING THE SAME COMPLETE INCLUDING BUCKET WASHING AND OTHER INCIDENTAL WORKS IN THIS CONNECTION THE TUBE WELL SCHEDULE HAVE A MINIMUM 50 MM GAP IN BETWEEN THE OUTSIDE OF THE TUBE WELL PIPE AND THE BORE. | - | M,ETER | 449.35 | - |
| 2 | 2. LABOUR FOR BORING TUBE WELL OF REQUIRED DIA BY WATER JET SYSTEM THROUGH ANY TYPE SOIL STRATA INCLUDING HIRE AND LABOUR CHARGES FOR BORING PIPES SCAFFOLDING TOOLS AND PLANTA AS NECESSARY AND TAKING OUT THEM AND LOWERING PIPES STRAINER BLIND PIPE ETC. AND FITTING AND FIXING THE SAME COMPLETE INCLUDING BUCKET WASHING AND OTHER INCIDENTAL WORKS IN THIS CONNECTION THE TUBE WELL SCHEDULE HAVE A MINIMUM 50 MM GAP IN BETWEEN THE OUTSIDE OF THE TUBE WELL PIPE AND THE BORE. | - | METER | 155.71 | - |
| 3 | CARRYING ETC STORE MATERIALS VIZ PIPE, STAINER, PUMP ETC. FROM STORE TO WORK SIDE | - | LS | 992.75 | - |
| 4 | SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 23 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction. | - | LS | 1,231 | - |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.4 | %M3 | 11,927 | ₹4,770.68 |
| 6 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | SQM | 358 | - |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | - | M3 | 4,572 | - |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | - | SQM | 724 | - |
| 9 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(ii) 25 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A). | - | SQM | 269 | - |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 1 | SQM | 161 | ₹160.98 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_2451013.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .