| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAccepted-AOC | ₹47.6 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹48.4 L+₹78,650 (1.65%)Rejected-Finance | ₹48.4 L+₹78,650 (1.65%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹51.1 L+₹3.5 L (7.42%)Rejected-Finance | ₹51.1 L+₹3.5 L (7.42%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹54.7 L+₹7.1 L (15.0%)Rejected-Finance | ₹54.7 L+₹7.1 L (15.0%) | L4 | Rejected-Finance L4 BIDDER |
| 5 | L5₹59.9 L+₹12.3 L (25.8%)Rejected-Finance | ₹59.9 L+₹12.3 L (25.8%) | L5 | Rejected-Finance L5 BIDDER |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
31 Jul 2020, 3:00 pmClosed
THE EXECUTIVE ENGINEER OS
O/o The Executive Engineer OS, ALHW, Port Blair - 744101
Providing RCC Ramp behind the Cholunga Jetty for Fish Landing facility at Phoenix Bay.
2020_ALHW_569286_1
ALHW/DCE-A/EE/OS/Tend40/19 -20
Open Tender
Civil Works
Works
180 days
PORT BLAIR
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
PAO, ALHW, PORT BLAIR
₹1.3 L
Yes
24 Sept 2021
7 Jul 2020
3 Aug 2020
8 Jul 2020
31 Jul 2020
22 Jul 2020
10 Jul 2020 - 17 Jul 2020
Amount
Surface dressing of the ground including removing vegetation and inequanties not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5m. including cost of all labour charges, minor tools, labour welfare cess, and GST etc. complete.
Earth work in excavation in foundation trenches (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M. (Ordinary rock) including cost of all labour charges, minor tools, cess, and GST etc. complete.
Dismantling R.C.C. work manually / by mechanical means including disposal of unserviceable materials within a lead of 50 metres and as per direction of Engineer-in-Charge including cost of all labour charges, minor tools and plant and the labour cess and GST etc. complete.
Supply and stacking of stone boulder of size 20 - 30 cm from approved quarry at Mainland to the work site, including cost of materials, conveying and stacking at site, royalty charges, transportation charges of all materials to work site,all labour charges, labour welfare cess, GST, minor tools and plants etc. Complete. (Lead 5 KM from jetty to work site).
Laying and packing of boulders of various sizes by using Hitachi/Manual in line of boulder packing in a lead of 500 Mtrs as per the drawing excluding cost of boulders which will be paid separately, but including cost of all labour charges in shifting, laying,proper packing in the alignment, minor tools, transportation charges of all materials to work site, labour welfare cess and GST etc. Complete.
Supply and stacking of stone metal of size 40- 60 mm from approved quarry at Mainland to the work site, including cost of stone boulder etc..conveying and stacking at site, royalty charges, transportation charges of all materials to work site, all labour charges, labour welfare cess, GST, minor tools and plants etc. Complete. (Lead 5.0 KM from jetty to work site).
Laying and packing of stone metal of sizes of 40 to 60 mm by using Manual in line of boulder bund in a lead of 500 Mtrs as per the drawing excluding cost of stone metal which will be paid separately, but including cost of all labour charges in shifting, laying, proper packing in the alignment, minor tools, transportation charges of all materials to work site, labour welfare cess, GST, etc. Complete.
Providing and laying of PCC 1:3:6 (1 cement, 3 mainland sand, 6 graded mainland stone metal 40mm size) over the boulder surface including proper packing, including cost of cement, mainland river sand, mainland stone metal 40mm size and transportation of all materials, all labour charges, labour welfare cess, GST and minor tools etc. complete.
Providing and laying R.C.C 1:1.5:3 with 20mm size stone chips (one cement one and half mainland sand, & three stone chips of size 2cm graded) in all RCC works as directed by the EIC, excluding cost of fabrication charges of steel reinforcement, centering & shuttering charges which will be paid seperately, but including cost of cement, mainland stone chips and mainland sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing, all labour charges, labour welfare cess, GST, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator etc. complete.
Supplying and fixing of reinforcement in RCC works as directed by EIC, including cost of fabrication & fixing steel rods, cost of steel rods, all handling charges, cutting, bending, lapping, tying and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, cost of binding wire, transportation charges for all materials to worksite, GST, all T&P required for the work and minor tools etc. complete.
Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work as directed by the Engineer In Charge, including cost of cantering and shuttering, all labour charges, labour welfare cess, GST, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, cost of minor tools etc. complete.
Bailing out the sea water from spring, tidal or drains, sea bed including hire charges pump set with POL and operator, cost of all labour charges, labour welfare cess, GST, transportation charges, minor tools etc. complete.
Supplying and Fixing of cast iron mooring ring at the required locations,level and alignment as directed by EIC and as per the approved drawings, including cost of mooring, ring, bolts, nuts & Washers etc. complete, hire charges of crane with POL & operator, cost of transportion charges of mooring ring, bolts, nuts & Washers, fixing the same with mooring ring bolt in concrete, welding charges for fixing mooring ring, cost of all labour charges, Labour welfare cess, GST, cost of minor tools, etc. complete.
Engaging of Hitachi for removal of slided boulder and levelling etc including cost of hire charges of Hitachi including POL & operator, all labour charges, labour welfare cess, GST and minor tools etc. complete.
Supplying and installation of the marker buoya including cost of materials, transportation charges, installation charges, acceseearies which are required for installation , all labour charges, labour welfare cess, GST and minor tools etc. complete
M/S SOPHIA CONSTRUCTIONS
M. RAVI
A.G.CONSTRUCTION
N V JOHN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .