Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance PANDAVESWAR BURDWAN INDIA BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹1.0 L (22.5%)Admitted-Finance APPA DITYA SAMANTA KENDRA PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹5.5 L+₹1.0 L (22.5%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹1.1 L (24.9%)Admitted-Finance | ₹5.7 L+₹1.1 L (24.9%) | L3 | Admitted-Finance |
| 4 | L4₹5.9 L+₹1.4 L (31.1%)Admitted-Finance | ₹5.9 L+₹1.4 L (31.1%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SK SARFUDDIN L1 | BAPPADITYA SAMANTA L2 | BAPPADITYA PAL L3 | PULAK DANDAPAT L4 |
|---|---|---|---|---|---|---|---|
| 1.00Reconstruction of 02(Two) nos. Ventilation Stoppings and Construction of 02(Two) nos. new Ventilation Stoppings in R-IV Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||||
| 1.01 | Site cleaning of debris. | 12 | Cum | 450 ₹5,400 Lowest | 655.35 ₹7,864.2 | 668.46 ₹8,021.48 | 701.88 ₹8,422.56 |
| 1.02 | Floor cutting in hard stone by hand. | 1.46 | Cum | 5,800 ₹8,468 Lowest | 5,822.49 ₹8,500.84 | 5,938.94 ₹8,670.85 | 6,235.89 ₹9,104.39 |
| 1.03 | Recess cutting in soft stone by hand. | 1.46 | Cum | 4,500 ₹6,570 Lowest | 4,574.82 ₹6,679.24 | 4,666.32 ₹6,812.82 | 4,899.63 ₹7,153.46 |
| 1.04 | Recess cutting in coal by hand. | 1.44 | Cum | 1,620 ₹2,332.8 Lowest | 1,621.45 ₹2,334.89 | 1,653.88 ₹2,381.59 | 1,736.57 ₹2,500.67 |
| 1.05 | P.B. Work (1:8) | 35.59 | Cum | 6,000 ₹2,13,540 Lowest | 6,852.59 ₹2,43,883.68 | 6,989.64 ₹2,48,761.35 | 7,339.12 ₹2,61,199.42 |
| 1.06 | Plastering both side (1:6) | 143.04 | Sq. meter | 300 ₹42,912 Lowest | 378.23 ₹54,102.02 | 385.79 ₹55,184.06 | 405.08 ₹57,943.26 |
| 1.07 | Loading & unloading materials from surface to U.G. | 148 | Tub | 500 ₹74,000 Lowest | 723.69 ₹1,07,106.12 | 738.16 ₹1,09,248.24 | 775.07 ₹1,14,710.65 |
| 1.08 | Mechanically transportation of tub (above 1500m) | 74 | Tub | 700 ₹51,800 Lowest | 913.99 ₹67,635.26 | 932.27 ₹68,987.97 | 978.88 ₹72,437.36 |
| 1.09 | Pushing tub manually (250 - 300m) | 74 | Tub | 500 ₹37,000 Lowest | 603.33 ₹44,646.42 | 615.4 ₹45,539.35 | 646.17 ₹47,816.32 |
Tender Value
₹6.5 L
EMD Value
₹8,200
Closing Date
31 Jul 2026, 6:00 pmClosed
Area Survey Officer
Office of the General Manager PandaveswarArea , P.O. Pandaveswar, Dist.-PaschimBardhaman, West Bengal-713346
Reconstruction of 02(Two) nos. Ventilation Stoppings and Construction of 02(Two) nos. new Ventilation Stoppings in R-IV Seam of Khottadih Colliery, Pandaveswar Area.
2026_ECL_362314_1
GM/PND/Sur/Ten/26-27/34/80 Dated 17.07.2026
Open Tender
Civil Works - Others
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,200
15 Sept 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
21 Jul 2026 - 24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of 02(Two) nos. Ventilation Stoppings and Construction of 02(Two) nos. new Ventilation Stoppings in R-IV Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Site cleaning of debris. | 12 | Cum | - | - |
| 1.02 | Floor cutting in hard stone by hand. | 1.46 | Cum | - | - |
| 1.03 | Recess cutting in soft stone by hand. | 1.46 | Cum | - | - |
| 1.04 | Recess cutting in coal by hand. | 1.44 | Cum | - | - |
| 1.05 | P.B. Work (1:8) | 35.59 | Cum | - | - |
| 1.06 | Plastering both side (1:6) | 143.04 | Sq. meter | - | - |
| 1.07 | Loading & unloading materials from surface to U.G. | 148 | Tub | - | - |
| 1.08 | Mechanically transportation of tub (above 1500m) | 74 | Tub | - | - |
| 1.09 | Pushing tub manually (250 - 300m) | 74 | Tub | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_375211.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .