Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹17.9 L+₹2.5 L (16.2%)Rejected-AOC NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | L2 | Rejected-AOC NOT BEING LOWEST | |
| 3 | L3₹20.2 L+₹4.8 L (30.8%)Rejected-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L3 | Rejected-AOC NOT BEING LOWEST | |
| 4 | L4₹21.2 L+₹5.8 L (37.4%)Rejected-AOC SITE NO 29 30 1ST CROSS NAGAPPA REDDY LAYOUT KAGGADASPURA CV RAMAN NAGAR BANGALORE 560093 | BENGALURU URBAN | KARNATAKA | 560093 | L4 | Rejected-AOC NOT BEING LOWEST | |
| 5 | L5₹21.7 L+₹6.3 L (40.7%)Rejected-AOC BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | L5 | Rejected-AOC NOT BEING LOWEST |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
12 Jul 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL MANOJ NEGI
CWE AF NORTH BANGALORE BELLARY ROAD JC NAGAR POST BANGALORE 560006
COMPREHENSIVE MAINTENANCE OF AC PLANTS AT VARIOUS LOCATIONS UNDER GE AF MARATHAHALLI
2024_MES_660768_1
87555CWEAFNMAR
Open Tender
Civil Works
Item Rate
330 days
GE (AF) MARATHAHALLI
AS PER NIT
7 documents required · 7 mandatory
₹0
₹34,000
Yes
15 Oct 2024
20 Jun 2024
19 Jul 2024
21 Jun 2024
12 Jul 2024
5 Jul 2024
21 Jun 2024 - 28 Jun 2024
Amount
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables and spare parts of central chilled water type AC plant 75TR x3 Nos (2x75 running, 1x75 ton standby) comprising of chiller unit with semi hermetic reciprocating compressor, chiller, condenser, refrigerating piping/controls and microprocesser control panel - 3 sets, chiller water pump set-20 HP capacity - 02 Nos. with chiller water pipe line and valves, condenser water pump set 30 HP capacity - 02 Nos with pipe line and valves, forced air FRP cooling tower with fan motor -01 Set, AHU with motor having capacity 20 HP -02 sets, GI sheet ducting, grills, fire damper, and strip heaters humidifier with pump set, MCC - 01 set,power and control wiring all as specified and directed by Engr-in-charge for smooth and efficient performance of AC plant to achieve desired inside conditions 20+/- 2degree C through out the year at SDI including submission of check list duly signed by contractor. Make - Blue Star Note : - Spares will be measured and paid separetely. (a) AC plants will be handed over on operation condition. (b) Maintaining the plant at good working condition & desired condition of 23 C + / - 2 C and relative humidity 55 % +/ - 5 %. (c) Comprehensive maintainance inludes the following : (i) checking of Air condition system. (ii) Inspection of safety and operation system. (iii) checking operating pressure. (iv) checking fan motor contactors. (v) checking the control of system. (vi) Unlimited breakdown complaints. (vii) cleaning filters. (viii) checking of cooling tower water pressure. (d) The BOQ item no 20 to 57 are not covered under comprehensive maintenance. (e) Any item otherthan BOQ Item No 20 to 57 required to be replaced / repair rate is deemed to be included in the quoted rate. (f) All instruments, tools and equipment/air blower required to clean/check/ repairs to be provided by contractor (g) Though maintenance of GI/GSS ducting is not included; adjustment of grills and repairs to grills to achieve proper flow of conditioned Air is deemed to be included in the quoted rate.
Comprehensive maintenance (daily/ monthly check) including first hand repairs with consumables for day to day maintenance of package type AC plant 10TR - 3 Nos & 11(2x5.5) TR - 01 No capacity comprising of sealed compressor, refrigerant piping and controls, MCC, power and control wiring, blower motor, air cooled condenser and condenser fan motor etc all as specified and directed by Engr-in-Charge for smooth and efficient performance of Package AC plant to achieve desired inside condition throughout the year at Telemetry Bldg(P-41 Bldg) ASTE, Make- Blue Star
All as per item No. 2 above, but 5.5 TR x 02 Nos capacity installed at P 11 Hangar ( AFNET SITE-II) at ASTE all as specified and directed by Engr-in-Charge. Make- VOLTAS
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 8.75 TR-01 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-01 No all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Nagesh Auditorium to achieve desired inside condition AT IAM. Make- HITACHI
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 11TR-01 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Engineer Auditorium to achieve desired inside condition at IAM. Make- HITACHI
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (5.5TR-02 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Nagesh Auditorium-01 & Engineer Auditorium-01 to achieve desired inside condition at IAM . Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (11 TR-03 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of P2 Bldg (AVIONICS LAB) to achieve desired inside condition at ASTE. Make- Blue Star
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 5.5TR-04 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for SIM -I & II Lab at SDI. Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 5.5TR-02 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for CLASS ROOM at SDI. Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (5.5TR-02 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of P1 Bldg (AFNET -SITE -I) to achieve desired inside condition at ASTE. Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for Package split AC units ( 5.5TR-01No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for ASTE EL TA LAb. Make -VOLTAS
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units 28.4 TR comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for MIG 29 at SDI . Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units( 34x2) 68 TR comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for ASTE (new hanger), Make Blue star
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 11TR- 1 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-03 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Engnieer Auditorium to achieve desired inside condition at IAM. Make -LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units 11X 3 TR nos comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning at IAM CHILLER PLANT, Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Digital Scroll type centralised AC plant (VRF type ) (5.5 TR X 3 Nos) consider as a one unit x 3 nos and including 21 Nos indoor units ie. fan coil unit comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-09 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for HPHC at IAM, Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Hi wall mounted air conditioner 3 phase of cap 3 TR, consider as a one unit x 08 Nos indoor units ie. fan coil unit comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-07 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for at 26 ED, Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Tower type air conditioner 3 phase of cap 2.5 TR, consider as a one unit x 04 Nos indoor units ie. fan coil unit comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for at 26 ED, Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Cassete type Split AC 3 of cap 3 TR, consider as a one unit x 04 Nos indoor units ie. fan coil unit comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for at 26 ED, Make - Voltas /Carrier Note for item No 2 to19 (a) Package / ductable / VRF AC plant in operating state will be handed over the condition as is what is basis. (b) Quoted rate is deemed to be inclusive of all consumables including petty items maintaining the plant at good working condition & desired condition of 23 C + / - 2 C and relative humidity 55 % + /- 5 %. (c) The Sch item no 20 to 51 are not covered under comprehensive maintenance. (d) All instruments, tools and equipment reqd to check and repairs to be provided by contractor. (e) Though maint of GI ducting is not included, adjustment of grills and repairs to grills to achieve proper flow of conditioned air is deemed to be included by quoted rate. (f) Comprehensive maintainance inludes the following : (i) checking of Air condition system. (ii) Inspection of safety and operation system. (iii) checking operating pressure. (iv) checking fan motor contactors. (v) checking the control of system. (vi) Unlimited breakdown complaints. (g) Any item otherthan Item No 20 to 51 required to replace / repair rate is deemed to be included in the quoted rate.
Dismantling and taking down of condensor fan motor of 1 HP from 3/5.5/8.75 TR ductable split AC rewinding the burnt copper conductor replacing bearings 2 Nos refixing and commissioning all as directed by Engr - in - Charge.
Dismantling and taking down of condensor fan motor of 2 HP from 11 TR ductable split AC rewinding the burnt copper conductor replacing bearings 2 Nos refixing and commissioning all as specified and directed by Engr - in - Charge
Supply and fix condensor fan blade suitable for 5.5 TR ductable split AC all as specified and directed by Engr - in - Charge
Disconnecting and replacing compressor contactor of 40 Amps complete all as specified and directed by Engr-in-Charge.
Disconnecting and replacing chiller motor contactor of 32 Amps complete all as specified and directed by Engr-in-Charge.
M & L Isolating the monoblock pumpset from position after disconnecting power and piping, transporting to workshop for overhauling the mono block pump set , 2850 Rpm 5 HP by replacing the bearing /bushes etc from both the motor and pump and refixing the same ,connecting up the power and water piping, testing and commissioning complete all as specified and directed by Engr-in-Charge.
Material & Labour for Over load protector of capacity 63Amp, 415V, relay range 20-33 Amps complete all as specified and directed by Engr-in-Charge.
Material and Labour for replacing water pressure guage 0-7kg/15kg complete all as specified and directed by Engr-in-Charge.
Material and Labour for replacing U/s panel push button assy ON/ OFF complete all as specified and directed by Engr-in-Charge.
Material and Labour for replacing of Rotary switches complete all as specified and directed by Engr-in-Charge.
Material and Labour for dismantling & Servicing of AHU Motor of capacity 20 HP by greasing to DE/NDE ball and roller bearings, refixing and commissioning complete all as specified and directed by Engr - in Charge.
Material and Labour for R-22 refrigeration gas complete all as specified and directed by Engr-in-Charge.
Material and Labour for Refrigeration gas R-407C complete all as specified and directed by Engr-in- Charge.
Disconnecting the electric /water connections of chilled water pump set monoblock type of capacity 20 HP and taking down from position and transporting to workshop for repair/rewinding. Dismantling the electric motor and taking out the burnt out copper winding from the slots, cleaning the slots and rewinding with suitable gauge of copper winding wire including the insulation and heating and refixing the motor after replacing the following worn out parts, Insulating the pump set ,commissioning/installing and testing after reconnecting the electric/water connections complete all as specified and directed by Engr-in-Charge. (a) Ball bearing - 02 Nos (b) SS sleeves - 02 Nos (c) Gun metal bush - 02 Nos
Disconnecting the electric connection from the cooling tower, taking out the fan and motor from the cooling tower of 10 HP capacity, servicing the fan and motor by greasing, oiling, varnishing, including heating etc and replacing the ball bearing-02 Nos, refixing the fan and motor to its original place and testing complete all as specified and directed by Engr-in-Charge.
Taking out the unserviceable OP cut out complete, supply and fix new OP cut out switch of type MP-55 complete all as specified and directed by Engr-in-Charge.
Taking out the unserviceable Power contactor and supply and fix Power contactor of the following type and size (as per sample) (a) MN -16 complete all as specified and directed by Engr-in-Charge.
All as per item No 36 but MN - 25/32 complete all as specified and directed by Engr-in-Charge.
Taking out the unserviceable timer for star delta Starter, Supply and fix timer for star delta starter timer Model –0313 or equivalent(as per sample) complete all as specified and directed by Engr-in-Charge.
Supply only of oil pump for preventive maintenance of A/C plant of capacity 225 TR aggregate in 3 units at SDI suitable for site requirements all as directed by Engineer-in-Charge.
All as per item No 39 Supply of oil filter .
All as per item No 39 Supply of crankcase Heater 230 V
All as per item No 39 Supply of drier core
Taking down Unserviceable phase preventer and S& F Phase preventer for 5.5 Ton complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable HP/ LP Cut out and S& F HP/LP Cut out for Ductable split AC complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable VPD and S& F VPD for 5.5 ton Ductable split AC . Moel No- VDSU04A1 complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable Split VPD and S& F Split VPD for 33 TR package chiller of Voltas Make for operating voltage of 320-500 VAC complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable Remote PCB and S& F Repairs to Remote PCB assembly for 3/5.5 TR ductable split AC complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable Air release valve and S& F Air release valve complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable Line In/ OUT Led Thermal digital thermometerr and S& F Line IN/ out let digital Thermometer with sensor complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable S&F Water pressure Gauge 100 mm dia with siphon set along with brass adaptor complete all as specified and directed by Engr-in-Charge.
Taking down Unserviceable S&F Water flow switch for Chiller plant complete all as specified and directed by Engr-in-Charge.
Taking out old unsv compressor of any type and supply and fixing scroll / Rotary compressor 5.5 TR capacity of existing make or equivalent using refrigerent R-22 all as directed at site by Engr-in-Charge.
Taking out old unsv compressors of any type and supply and fix 3 Phase compressor model No : ZR 48K3TFD522 of 3.0 Ton capacity of existing make or equivalent complete all as specified and directed by Engr-in-Charge.
Supply & fix microprocessor control panel for 33 TR DX Scroll chilled water central AC plant at IAM complete all as specified and directed.
Material and labour for leak testing with Nitrogen, assembling, brazing vacuuming complete all as specified and directed.
M&L for servicing AHU of AC plant 75 TR including cleaning accessories ducts,filters, cooling coil greasing bearing, checking the alignment etc and servicing to blower motor by replacing bearing/ bushes etc and greasing oiling and refixing the same testing and commissioning complete all as specified and directed by Engr-in-Charge.
Material and labour for descaling the condenser of capacity 75 TR after dismantling the inlet and out let water connections providing the necessary dummies and circulating descaling acid with help of external pump, brushing the condenser tubes removing the scale neutralizing the base of tubes by circulating neutralizing agent replacement of rubber gasket for the end covers of the condenser removing the dummies connecting the water pipe line connections removing the air lock testing and commissioning complete all as specified and directed by Engr-in-Charge.
Glacier Cooling Solutions Private Limited (BID ID -3054838)
devan enterprises (BID ID -3054589)
Aavani BUILDERS AND CONTRACTORS (BID ID -3053553)
RAHUL ENTERPRISES (BID ID -3057882)
M/S SRI BALAJI ENTERPRISES (BID ID -3058403)
RRK PROJECTS (BID ID -3059401)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .