Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC VILLAGE RATAULI DISTRICT ROHTAK | ROHTAK | ROHTAK | HARYANA | ₹2.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 L+₹4,261 (2.15%)Rejected-AOC 0 MAHARISHI DAYANAND NAGAR 1 KANHELI ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | ₹2.0 L+₹4,261 (2.15%) | L2 | Rejected-AOC L2 |
Tender Value
₹2.0 L
EMD Value
₹3,970
Closing Date
8 Jun 2026, 5:00 pmClosed
Jagmal
DIV 1 Rohtak
A/mtc of Master Roads in Urban Estate, Rohtak for the year 2026-27.
2026_HBC_526308_1
20263FC43CEA 6671 4FF4 A794 BEDDD37D8001267HSV
Open Tender
Civil Works
Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹3,970
Yes
30 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
8 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 6 | Per day | 6,493 | ₹38,958 |
| 2 | [17.14.3]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading III material | 40 | cum | 1,197 | ₹47,880 |
| 3 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications | 40 | cum | 1,174 | ₹46,960 |
| 4 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. | 350 | cum | 184 | ₹64,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_605285.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .