| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹8.9 L (7.02%)Admitted-Finance | ₹1.4 Cr+₹8.9 L (7.02%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹9.0 L (7.13%)Admitted-Finance | ₹1.4 Cr+₹9.0 L (7.13%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹17.8 L (14.1%)Admitted-Finance | ₹1.4 Cr+₹17.8 L (14.1%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹19.1 L (15.1%)Admitted-Finance 23 1 MANDIR LINE MW SINGTAM NAGAR PANCHAYAT SINGTAM EAST SIKKIM 737134 | EAST DISTRICT | SIKKIM | 737134 | ₹1.5 Cr+₹19.1 L (15.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sunrise enterprises L2 | S.N.MARKETING L5 | KAMAKHYA CONSTRUCTION L1 | FUTURE FORTUNE INFRASTRUCTURE PRIVATE LIMITED L4 | GURU CHARAN SINGH L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means, upto 3 m depth, (i) With pumping out water including shoring as required. | 500 | Cum | 99 ₹49,500 | 116 ₹58,000 | 54.66 ₹27,330 Lowest | 300 ₹1,50,000 | 100.32 ₹50,160 |
| 2.00 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 3,600 | Cum | 2,750 ₹99,00,000 Lowest | 2,915 ₹1,04,94,000 | 2,899.36 ₹1,04,37,696 | 2,850 ₹1,02,60,000 | 2,759.57 ₹99,34,452 |
| 3.00 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree | 720 | Cum | 4,325 ₹31,14,000 | 4,842 ₹34,86,240 | 2,605.29 ₹18,75,808.8 Lowest | 5,000 ₹36,00,000 | 4,294.98 ₹30,92,385.6 |
| 4.00 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor), (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | 1,520 | SQM | 270 ₹4,10,400 | 301 ₹4,57,520 | 168.67 ₹2,56,378.4 Lowest | 200 ₹3,04,000 | 270.21 ₹4,10,719.2 |
| 5.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (b) With earth obtained by fresh excavation (including cost of excavation upto 1,800 mm. depth) from land arranged by the Deptt. within a lead of 100 m. | 360 | Cum | 110 ₹39,600 | 122 ₹43,920 | 83.13 ₹29,926.8 Lowest | 250 ₹90,000 | 110.98 ₹39,952.8 |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
2 Nov 2024, 3:00 pmClosed
GSM(M)
Contract DivisionTeesta Low Dam-III PS RAmbi, Darjeeling
Power house right bank road terrace protection works damaged to due to severe flood occurred in Teesta River
2024_NHPC_831569_1
NH/TLD-III PS/Cont./F-1159/138
Open Tender
Civil Works
Works
120 days
Teesta Low Dam-III PS RAmbi
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
NHPC LIMITED
₹4.0 L
21 Jan 2025
19 Oct 2024
6 Nov 2024
19 Oct 2024
2 Nov 2024
19 Oct 2024
Amount
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means, upto 3 m depth, (i) With pumping out water including shoring as required.
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor), (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (b) With earth obtained by fresh excavation (including cost of excavation upto 1,800 mm. depth) from land arranged by the Deptt. within a lead of 100 m.
Sunrise enterprises (BID ID -3113136)
GURU CHARAN SINGH (BID ID -3113126)
FUTURE FORTUNE INFRASTRUCTURE PRIVATE LIMITED (BID ID -3113922)
S.N.MARKETING (BID ID -3113289)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
TD.pdf
Tender Documents • 3.15 MB
BOQ_873824.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .