| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -7.99% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance | -4.75% | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical AT M ROAD NEAR KAMANI CENTRE BISTUPUR JAMSHEDPUR | EAST SINGHBUM | JHARKHAND | 831001 | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
24 Feb 2026, 5:00 pmClosed
Secretary,
Zila Parishad, East Singhbhum
Construction of Primary Health Centre Building at Rawtara under Dhalbhumgarh block
2026_ZPESJ_110409_4
ESZP/JSR/Epro-12/2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
Dhalbhumgharh
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.9 L
7 Apr 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
24 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | 0.8 | cum | 151.82 | ₹121.46 |
| 2 | Extra for earth work in hard soil as per specification & direction of engineer in charge (Vide classification of soil item B) | 0.2 | cum | 15.51 | ₹3.1 |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 0.8 | cum | 55.28 | ₹44.22 |
| 4 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer In charge (Mode of measurement compacted volume) | 1 | cum | 589.51 | ₹589.5 |
| 5 | Providing and laying in position cement concete of soecified grade excluding the cost of centering and shuttering - All work up tp plinth level 1:4:8 (1 cement :4 coarse sand (Zone -III) :8 graded stone aggregrate 40 mm normial size) | - | cum | 3,751.64 | - |
| 6 | R C C WORK Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 5,218 | ₹5,217.95 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 1 | cum | 6,082.45 | ₹6,082.39 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chayas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 0.2 | cum | 6,308.87 | ₹1,261.77 |
| 9 | Providing Tor steel reinforcement of 8mm. dia rods as per approved design and drawing -do- -do- TMT Fe 500 (Only valid for sAIL & TATA Stee 20% | 0.64 | MT | 83,314.02 | ₹53,320.14 |
| 10 | Providing Tor steel reinforcement of 10mm. Dia. bars as per approved design and drawing -do- -do - 15% | 0.48 | MT | 82,096.54 | ₹39,405.52 |
stage.html
html • 0.03 MB
technical_149280.pdf
techsummary_149280.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
SBD_Gr_12004.pdf
Tender Documents • 0.56 MB
BOQ_149280.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].