| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAdmitted-Finance | ₹47.5 L | L1 | Admitted-Finance |
| 2 | L2₹48.0 LAdmitted-Finance | ₹48.0 L | L2 | Admitted-Finance |
| 3 | L3₹55.4 LAdmitted-Finance | ₹55.4 L | L3 | Admitted-Finance |
| 4 | L4₹58.4 LAdmitted-Finance | ₹58.4 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DEEP ENTERPRISES L3 | M/S. S B ENTERPRISES L4 | INFINITY ENGINEERING L2 | IDEAL CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|---|
| 1.00Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 2 km all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. | |||||||
| 1.01 | From 0.00 to 1.50 m depth from average ground level | 546 | Cu.m | 200 ₹1,09,200 | 365 ₹1,99,290 | 200 ₹1,09,200 | 150 ₹81,900 Lowest |
| 1.02 | Extra over initial depth for every additional Depth of 1.50 m or part thereof | 50 | Cu.m | 250 ₹12,500 | 500 ₹25,000 | 200 ₹10,000 | 180 ₹9,000 Lowest |
| 2.00 | Labour charges for murum filling under floors of specified thickness in layers of not exceeding 150 mm thickness including consolidation etc. complete (using murrum available at BARC campus with a lead of up to 4 Km) Note: a) Only compacted volume will be measured and paid,
b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes. | 183 | Cu.m | 600 ₹1,09,800 | 410 ₹75,030 | 275 ₹50,325 Lowest | 280 ₹51,240 |
| 3.00 | Supplying, Stacking and Laying of 150 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 102 | Sq.m | 700 ₹71,400 | 320 ₹32,640 | 270 ₹27,540 Lowest | 270 ₹27,540 Lowest |
| 4.00Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | |||||||
| 4.01 | 230mm With outside material | 400 | Sq.m | 800 ₹3,20,000 | 785 ₹3,14,000 | 580 ₹2,32,000 | 550 ₹2,20,000 Lowest |
| 5.00 | Providing and laying in position PLUM Concrete with 70 % cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) and 30 % 150 to 230 mm size soling stones spreading uniformly as per directions of the Engineer-in-Charge including consolidation, finishing, curing etc. complete as per specifications and drawings but excluding the cost of Form work shuttering, centering complete at all levels | 99 | Cu.m | 8,000 ₹7,92,000 | 6,950 ₹6,88,050 | 5,600 ₹5,54,400 | 5,100 ₹5,04,900 Lowest |
| 6.00 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specifications and drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 51 | Cu.m | 6,200 ₹3,16,200 | 7,775 ₹3,96,525 | 6,200 ₹3,16,200 | 6,000 ₹3,06,000 Lowest |
| 7.00 | Providing and constructing Random Rubble masonry using approved Rubble stone in foundation and plinth in C.M 1:6 (using crushed sand) including raking out joints or simultaneous flush pointing below ground level / plinth level, curing etc. complete as per drawings and specifications. | 17 | Cu.m | 6,500 ₹1,10,500 | 5,175 ₹87,975 | 4,400 ₹74,800 | 4,250 ₹72,250 Lowest |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
7 Feb 2026, 3:00 pmClosed
PM,INRPO
NRB,Tarapur
Miscellaneous civil works for nisarguna at NRB,BARC,Tarapur
2026_NRB_894202_1
BARCT/NRB/INRPO/GSO50
Open Tender
Civil Works
Works
240 days
NRB, Tarapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 L
15 Jun 2026
19 Jan 2026
9 Feb 2026
19 Jan 2026
7 Feb 2026
24 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 2 km all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. | |||||
| 1.01 | From 0.00 to 1.50 m depth from average ground level | 546 | Cu.m | - | - |
| 1.02 | Extra over initial depth for every additional Depth of 1.50 m or part thereof | 50 | Cu.m | - | - |
| 2 | Labour charges for murum filling under floors of specified thickness in layers of not exceeding 150 mm thickness including consolidation etc. complete (using murrum available at BARC campus with a lead of up to 4 Km) Note: a) Only compacted volume will be measured and paid,
b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes. | 183 | Cu.m | - | - |
| 3 | Supplying, Stacking and Laying of 150 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 102 | Sq.m | - | - |
| 4Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | |||||
| 4.01 | 230mm With outside material | 400 | Sq.m | - | - |
| 5 | Providing and laying in position PLUM Concrete with 70 % cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) and 30 % 150 to 230 mm size soling stones spreading uniformly as per directions of the Engineer-in-Charge including consolidation, finishing, curing etc. complete as per specifications and drawings but excluding the cost of Form work shuttering, centering complete at all levels | 99 | Cu.m | - | - |
| 6 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specifications and drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 51 | Cu.m | - | - |
| 7 | Providing and constructing Random Rubble masonry using approved Rubble stone in foundation and plinth in C.M 1:6 (using crushed sand) including raking out joints or simultaneous flush pointing below ground level / plinth level, curing etc. complete as per drawings and specifications. | 17 | Cu.m | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.33 MB
Technicalbid.xls
Additional Documents • 0.08 MB
BOQ_939896.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].