| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC 1 218 1C SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹23.5 L+₹4.0 L (20.5%)Rejected-Finance HOUSE NO 86 SUJEET VERMA RAJEEV NAGAR PH 3 DELHI NORTH WEST DELHI DELHI 110086 UDYAM DL 06 0117122 | NORTH WEST DELHI | DELHI | 110086 | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹23.8 L+₹4.3 L (21.8%)Rejected-Finance C 204 NANGLI EXTN NEW DELHI | WEST | DELHI | 110043 | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹27.1 L+₹7.6 L (39.0%)Rejected-Finance PLOT NO 17 GF PRATAP NAGAR NEW DELHI 110064 | WEST | DELHI | 110064 | L4 | Rejected-Finance Being other than lowest | |
| 5 | L5₹28.2 L+₹8.7 L (44.4%)Rejected-Finance 08 PINK ENCLAVE MAHESH NAGAR BALAJI VIHAR GOPALPURA JAIPUR RAJASTHAN 302015 INDIA | JAIPUR | RAJASTHAN | 302015 | L5 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | M/s Durga Traders L4 | MAA SANTOSHI ENTERPRISES L8 | S GOURAV PRAKASH ENTERPRISES L3 | M/s Verma and Co L2 | Kunal Construction Co. L6 | M/s Shubh Enterprises L7 | M/S SIMRAN CONSTRUCTION CO L5 | THE LOTUS BUILDTECH L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling/ taking out of existing roof tretment with APP membrane of any thickness including taking out existing sreed bed / rendering of any thickness with all necessary arrangements complete all as specified and as directed. | 1,300 | Sqm | 10 ₹13,000 | 5 ₹6,500 | 30 ₹39,000 | 150 ₹1,95,000 | 5 ₹6,500 | 20 ₹26,000 | 4 ₹5,200 Lowest | 96 ₹1,24,800 |
| 2.00 | M&L for cleaning and grinding the surface and repair the pot holes spalled concrete using PMM. Then Apply polymer coating using SBR Polymer with the consumption of 250-300gm/sqm for better adhesion of waterprooofing layer. Then Apply cementitious acrylic coating with consumption of 3kg/sqm in 3 coats having elongation more than 200%. Then provide 200 GSM Geotextile, protection screed minimum 50mm thick PCC 1:2:4 type B -1 (using 20mm graded crushed stone agregate) as in roof proper slop. Then complete all as specified and as directed.
Make : Asian Paints or equivelent in Berger/ Nerolac/ STP only.
Notes: (1) The work shall be executed through authorised appplicatot of manufacturer only.
(2) Authorised Applicator shall be approved by GE befor starting the work.
(3) All materials shall be produced directly from manufacturer. The purchase voucher shall be produced to the Engineer-in-Cgarge for his verification of material. Engineer-in-Cgarge shall deface the original purchage vouchers.
(4) Guarantee: The contractor shall furnish a written guarantee for the effectiveness of the water Proofing treatment for a period of Eight years in fevour of GE. A sum equivelent to 2.5% (Two point five Percent) of the cost of water proofing treatment shall be retained by the Govt from the contractor's dues as security deposite. The contractor may, however, furnish a fixed deposite receipt in lieu from a Schedule bank pledged in fevour of Garrison Engineer. | 1,300 | Sqm | 1,400 ₹18,20,000 | 1,990 ₹25,87,000 | 930 ₹12,09,000 | 410 ₹5,33,000 Lowest | 1,650 ₹21,45,000 | 1,800 ₹23,40,000 | 1,111 ₹14,44,300 | 716 ₹9,30,800 |
| 3.00 | S&F for Heat Resistant Terrace Tiles (300 mm x 300 mm x 20 mm) with SRI (solar refractive index) > 78, solar reflection > 0.70 and initial emittance > 0.75 on waterproof and sloped surface of terrace, laid on 20 mm thick cement sand mortar in the ratio of 1:4 (1 cement : 4 coarse sand) and grouting the joints with mix of white cement & marble powder in ratio of 1:1, including rubbing and polishing of the surface upto 3 cuts complete, including providing skirting upto 150 mm height along the parapet walls in the same manner. complete all as specified and as directed. | 1,300 | Sqm | 575 ₹7,47,500 | 890 ₹11,57,000 | 750 ₹9,75,000 | 1,100 ₹14,30,000 | 800 ₹10,40,000 | 720 ₹9,36,000 | 977 ₹12,70,100 | 560 ₹7,28,000 Lowest |
| 4.00 | Taking down cement or lime plaster any description on brick or stone walls etc including recking out joints hacking for key scrubbing down with waters etc. | 200 | Sqm | 10 ₹2,000 | 9 ₹1,800 | 5 ₹1,000 Lowest | 10 ₹2,000 | 20 ₹4,000 | 20 ₹4,000 | 12 ₹2,400 | 16 ₹3,200 |
| 5.00 | M & L for rendering 15 mm thick in cement mortor 1:4 on brick/ concrete surfaces and finishing the surface even and fair without using extra cement complete all as specified directed. | 200 | Sqm | 150 ₹30,000 | 230 ₹46,000 | 190 ₹38,000 | 150 ₹30,000 | 200 ₹40,000 | 200 ₹40,000 | 122 ₹24,400 Lowest | 246 ₹49,200 |
| 6.00 | M&L for prepration of newly plastered surfaces of wall and applying two coats of cement base paint complete all as specified and directed . | 200 | Sqm | 29 ₹5,800 | 32 ₹6,400 | 43 ₹8,600 | 50 ₹10,000 | 25 ₹5,000 | 25 ₹5,000 | 21.79 ₹4,358 Lowest | 66 ₹13,200 |
| 7.00 | M&L for PCC 1:2:4 Type B - I (using 20 mm graded stone aggregate) as Roof kerb, Kerb stone, coping or packing of sides, edges including necessary form work etc complete all as specified. | 2.75 | Cum | 4,499 ₹12,372.25 | 3,800 ₹10,450 | 5,500 ₹15,125 | 3,100 ₹8,525 Lowest | 4,500 ₹12,375 | 7,500 ₹20,625 | 4,334 ₹11,918.5 | 4,600 ₹12,650 |
| 8.00 | Surface excavation not exceeding 30cm deep and averaging 15cm deep and getting out in any soft soil complete all as specified and directed. | 75 | Sqm | 9 ₹675 Lowest | 230 ₹17,250 | 120 ₹9,000 | 450 ₹33,750 | 10 ₹750 | 40 ₹3,000 | 11 ₹825 | 96 ₹7,200 |
| 9.00 | Removing excavated material to a distance exc. 50 m and depositing where directed at a level not exc 1.50 m above the starting point complete all as specified and as directed by EIC. | 11.25 | Cum | 50 ₹562.5 | 45 ₹506.25 | 200 ₹2,250 | 450 ₹5,062.5 | 150 ₹1,687.5 | 70 ₹787.5 | 33 ₹371.25 Lowest | 160 ₹1,800 |
| 10.00 | M&L for hard core of broken stone or boulder of gauge not exc 63mm, deposited, spread and level in layers not exc 15cm thick watered and rammed to a true surface complete all as specified and directed. | 10.8 | Cum | 1,800 ₹19,440 | 3,200 ₹34,560 | 1,300 ₹14,040 | 3,100 ₹33,480 | 2,000 ₹21,600 | 3,200 ₹34,560 | 444 ₹4,795.2 Lowest | 1,260 ₹13,608 |
Tender Value
₹48.0 L
EMD Value
₹95,669
Closing Date
19 Sept 2025, 6:00 pmClosed
GE (EAST) DELHI CANTT-10
GE (EAST) DELHI CANTT-10
SPL REPAIR FOR ROOF TREATMENT OF BLDG NO P-2 OF TOMA AND PROVN OF HARDSTANDING WITH INTERLOCKING TILE IN P-6 BAIRD PLACE IN THE AREA OF AGE B/R-II UNDER GE (EAST) DELHI CANTT-10
2025_MES_728498_1
GE/DE-96/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE (EAST) DELHI CANTT-10
Class D/ Cat a (i)
9 documents required · 9 mandatory
₹500
Yes
GE (EAST) DELHI CANTT-10
₹95,669
Yes
3 Nov 2025
30 Aug 2025
22 Sept 2025
30 Aug 2025
19 Sept 2025
13 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .