Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 1FF AL HYDER SHOPPING COMPLEX NEW AIRPORT IG ROAD DR LAL PATH LABS HYDERPORA SRINAGAR 190014 | BUDGAM | JAMMU AND KASHMIR | 190014 | ₹1.4 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical CORPORATE OFFICE E BLOCK E44 GROUND FLOOR SECTOR 36 G B NAGAR 201310 | NAGAR | G B NAGAR | UTTAR PRADESH | 201310 | - | - | Rejected-Technical Not Eligible as per NIT |
| Sl No | Description | Qty | Unit | TK ELEVATIOR INDIA PVT.LTD L1 |
|---|---|---|---|---|
| 1.00Sub Head I: Modernization of Existing 4 Nos. (Johnson Make) Escalators: Modernization of existing 04 nos.(Make: Johnson) complete monolithic step reversible type escalator with an inclination of 35 deg. from horizontal, ascending and descending passenger service from ground floor to first floor having 5.75 meter vertical height having capacity of 9000 persons/hour at a linear speed of 0.5 m/sec. operating an 3 phase, 415 volts, 50 Hz AC supply with motor capacity of 11 KW etc. and detailed scope of work as per the Special conditions of contract & Technical Specifications of contract etc. Complete as required. | ||||
| 1.10 | Location (1): Terminal Building (SHA) International Departure | 1 | Job | 22,88,136 ₹22,88,136 Lowest |
| 1.20 | Location (2): Terminal Building (SHA) Domestic Departure | 1 | Job | 22,88,136 ₹22,88,136 Lowest |
| 1.30 | Location (3): Terminal Building Domestic Arrival | 1 | Job | 22,88,136 ₹22,88,136 Lowest |
| 1.40 | Location (4): Terminal Building International Arrival | 1 | Job | 22,88,136 ₹22,88,136 Lowest |
| 2.00Sub Head II-: All Inclusive Comprehensive Maintenance (AICMC) Comprehensive annual maintenance contract for 04 nos. escalators [for SH-(1)] inclusive of all spare parts to maintain the system healthy on all days inclusive of periodic maintenance as per schedule as well as breakdown maintenance as and when called or needed and on monthly basis. [Note: AMC will start after One year of completion of work as for One year same are covered under defect liability period.] as per terms and conditions of agreement. | ||||
| 2.10 | AICMC charges for 2nd year after DLP of 01 Year | 4 | Job per Year | 2,05,932 ₹6,93,249.48 Lowest |
| 2.20 | AICMC charges for 3rd year after DLP of 01 Year | 4 | Job per Year | 2,21,377 ₹6,83,789.28 Lowest |
| 2.30 | AICMC charges for 4th year after DLP of 01 Year | 4 | Job per Year | 2,37,980 ₹6,74,340.13 Lowest |
| 2.40 | AICMC charges for 5th year after DLP of 01 Year | 4 | Job per Year | 2,55,929 ₹6,65,313.03 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹4.8 L
Closing Date
5 Nov 2025, 6:30 pmClosed
SR. MANAGER (ENGG ELECT)
SR. MANAGER (ENGG ELECT)
Modernization of Existing 4 Nos. (Johnson Make) Escalators with All-inclusive comprehensive maintenance contract at Srinagar Intl Airport, Srinagar.
2025_AAI_252321_1
AAI/SNR/ENGG-E/ESCALATOR/2025
Open Tender
Electrical Works
Works
120 days
SRINAGAR AIRPORT
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
₹4.8 L
5 Jan 2026
14 Oct 2025
7 Nov 2025
14 Oct 2025
5 Nov 2025
14 Oct 2025
14 Oct 2025 - 22 Oct 2025
Amount
Sub Head I: Modernization of Existing 4 Nos. (Johnson Make) Escalators: Modernization of existing 04 nos.(Make: Johnson) complete monolithic step reversible type escalator with an inclination of 35 deg. from horizontal, ascending and descending passenger service from ground floor to first floor having 5.75 meter vertical height having capacity of 9000 persons/hour at a linear speed of 0.5 m/sec. operating an 3 phase, 415 volts, 50 Hz AC supply with motor capacity of 11 KW etc. and detailed scope of work as per the Special conditions of contract & Technical Specifications of contract etc. Complete as required.
Location (1): Terminal Building (SHA) International Departure
Location (2): Terminal Building (SHA) Domestic Departure
Location (3): Terminal Building Domestic Arrival
Location (4): Terminal Building International Arrival
Sub Head II-: All Inclusive Comprehensive Maintenance (AICMC) Comprehensive annual maintenance contract for 04 nos. escalators [for SH-(1)] inclusive of all spare parts to maintain the system healthy on all days inclusive of periodic maintenance as per schedule as well as breakdown maintenance as and when called or needed and on monthly basis. [Note: AMC will start after One year of completion of work as for One year same are covered under defect liability period.] as per terms and conditions of agreement.
AICMC charges for 2nd year after DLP of 01 Year
AICMC charges for 3rd year after DLP of 01 Year
AICMC charges for 4th year after DLP of 01 Year
AICMC charges for 5th year after DLP of 01 Year
AICMC charges for 6th year after DLP of 01 Year
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
TENDERDOCUMENTESCALATOR.pdf
Tender Documents • 2.88 MB
BOQ_289882.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .