| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | L1 | Accepted-AOC overall 1st lowest bidder | |
| 2 | L2₹25.4 L+₹1.2 L (5.06%)Rejected-Finance | L2 | Rejected-Finance OVERALL 2nd lowest bidder | |
| 3 | L3₹31.2 L+₹7.0 L (29.0%)Rejected-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L3 | Rejected-Finance OVERALL3rd lowest bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical all uploaded docs are not as per pqc |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
14 Mar 2022, 6:00 pmClosed
se
office of se omc 4 btps anpara
upkeep cleaning of switchyard and cable trays galleries of btps
2022_RVUNL_675737_1
03/EMD-II/BTPS/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
btps anpara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
dy cao cfa bo btps anpara
₹60,000
4 Apr 2022
10 Feb 2022
16 Mar 2022
10 Feb 2022
14 Mar 2022
10 Feb 2022
Amount
PART-A1: work in this part shall include upkeep of the following areas/locations of ‘A’ TPS switchyard
(a)Upkeep of MCB control room floor & panel/board. (b)Upkeep of Battery room in switchyard (c)Upkeep of MCC room & charger room including panels. (d)Upkeep of PLCC/ Carrier room & panel. (e)Upkeep of testing lab, AE’s office, storeroom, shift engineer room, staircases & galleries of MCB. (f)Upkeep of 4 No. bathrooms/latrines. (g)Upkeep of Compressor room in switchyard. (h) Upkeep of 11 KV switchgear room, panels, operator room, store room, external veranda around 11 KV switchgear room.
PART-A2: The works against this part shall include the following jobs pertaining to ‘A’ TPS switchyard. The quantities mentioned are maximum quantity & the quantity may vary widely. These works shall be done as & when required:
Upkeep of marshalling boxes, panels/cabinets of 400/132/33 KV switchyard .
Cleaning of oil pit (lxbxh)- 7x7x3.2 m
Cleaning of oil pit (lxbxh)- 4.5x4x5 m
Cleaning of oil pit (lxbxh)- 2.5x2x1.75 m
Cleaning of latrine pit
Cleaning of roads in 132/400 KV switchyard area
Cleaning of Cable gallery of MCB of 400/132 KV system including trenches of ATPS & BTPS.
PART-A3: The work in this part shall include upkeep of the following areas/locations of ‘B’ TPS switchyard:
Cleaning of site offices, stores, toilet, compressor room, etc
PART-A4 The work in this part shall include upkeep of the online ABT monitoring system:
Cleaning of online ABT monitoring system of ATPS & BTPS.
PART-A5: The works against this part shall include the following jobs pertaining to ‘B’ TPS switchyard. The quantities mentioned are maximum quantity & the quantity may vary widely. These works shall be done as & when required:
Cleaning of all roads within the BTPS switchyard once a month
Cutting of plants more than six inches in height adjacent to BTPS switchyard
PART-A6: The work in this part shall include Removal and disposal of grass, wild plants, shrubs, etc in 400KV Anpara ‘B’TPS switchyard including ICT-3, 33KV Reactor areas: including ICT-3, 33KV Reactor areas)
Removal & Disposal of grass, wild plants, shrubs, etc as per scope of work for approx. 55,000.00 M2 of ‘B’TPS switchyard including ICT-3, 33KV Reactor areas
Removal & Disposal of grass, wild plants, shrubs, etc as per scope of work for approx. 60,000.00 M2 of 400/132KV ‘A’TPS switchyard.
PART-B: The work shall include grass cutting and its removal & disposal to the suitable location as instructed by engineer in charge within the area of ‘A’ & ‘B’ TPS switchyard
PART-B1:(400/132/33/11KV Anpara ‘A’TPS, Switchyard.)
Cutting & Disposal of grass & wild plants, shrubs in surrounding periphery area of 400/132/33 KV switchyard and corridor of unit 1 to 5 transmission lines as per scope of work for approx. 1,80,000.00 M2
Removal & disposal of cows or any animals from A&B TPS Switchyard.
PART-B2: (132KV Overhead structure of CWT-1 & 2 from 132KV switchyard to CW transformers)
Cutting & Disposal of grass, wild plants, shrubs, etc as per scope of work for approx. 10000.00 M2
PART-B3:Trimming of trees under the live conductors of ‘A’ &’B’ TPS Trimming of trees (diameter 50mm, height above 2 meters ) up to a height of 500mmwhich grow under the live conductor starting from Turbine Hall to Switchyard and up to 10 meters on either side of the gantry .Diameter of trees shall be measured at 1000 mm from the ground.
50 to 100 mm dia- 70 nos
100 to 150 mm dia-20 nos
Above 150 mm dia-10 nos
PART-B4: (132 KV cable trench including LANCO area.)
Cutting & Disposal of grass, wild plants, shrubs, etc as per scope of work for approx. 7700.00 M2
PART-B5: (Maintenance of switchyard lawn area.)
Maintenance of grass lawns including cutting if grass with lawn mower or foot drive thresher including watering and removing weed etc. (Area of Lawn=1929 m2)
PART-C
Preparation & spray of anti weed solution in 400KV 'A'TPS switchyard area. (three times in a year- 3Job)
Preparation & spray of anti weed solution in 400KV 'B'TPS switchyard area. (three times in a year- 3Job)
Preparation & spray of anti weed solution in 132KV 'A'TPS switchyard area. (three times in a year- 3Job)
Preparation & spray of anti weed solution in adjacent area of A and B TPS 400/132KV switchyard area (three times in a year- 3Job)
PART-D
Cleaning of cable trays and cable risers of Power cables & Control cables of various cable galleries, boiler areas, mill areas (excluding 0 to 15 mtr), TG floor, DFA & ESP areas (Under scope of work of EMD-II, BTPS) of unit #4 & #5of 2X500MW, BTPS, Anpara
G K P Const. Project Company
M/S SHYAM ERECTORS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .