| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC F5 SURIYAN ELITE RESIDENCY GANGAI AMMAN KOIL STREET KARUVADIKUPPAM PUDUCHERRY 605 008 | PONDICHERRY | PUDUCHERRY | 605008 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 CrRejected-Finance NO 10 44 GURU SARAVANA FLAT 19TH STREET NANGANALLUR CHENNAI 600 061 | CHENNAI | TAMIL NADU | 600061 | ₹1.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 CrRejected-Finance 162 1 NADUTHERU VENKATESWARA NAGAR ACHARAMPATTU IRUMBAI P O 605 111 | PUDUCHERRY | PUDUCHERRY | PUDUCHERRY | 605111 | ₹1.8 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 CrRejected-Finance 2 E FRONT BLOCK 283 OLD NO 188 B P H ROAD KILPAUK CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | ₹1.8 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.0 CrRejected-Finance | ₹2.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SRI MARUTHI CONSTRUCTIONS L1 | RECHI CONSTRUCTION PVT LTD L2 | J.P.M. Building Construction and Interior Works L3 | R.Krishnamurthy and Co L4 | S R NEELAMEGAM L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 210 | Cum | 500 ₹1.1 L | 1,500 ₹3.1 L | 2,000 ₹4.2 L | 2,250 ₹4.7 L | 900 ₹1.9 L |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 10 | Cum | 500 ₹5,000 | 2,500 ₹25,000 | 3,000 ₹30,000 | 2,250 ₹22,500 | 900 ₹9,000 |
| 3.00 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
a) Lime, moorum, building rubbish | 220 | Cum | 100 ₹22,000 | 150 ₹33,000 | 150 ₹33,000 | 200 ₹44,000 | 120 ₹26,400 |
| 4.00 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
b) Earth | 660 | Cum | 125 ₹82,500 | 200 ₹1.3 L | 200 ₹1.3 L | 200 ₹1.3 L | 110 ₹72,600 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil | 1,520 | Cum | 150 ₹2.3 L | 200 ₹3.0 L | 250 ₹3.8 L | 270 ₹4.1 L | 180 ₹2.7 L |
| 6.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 870 | Cum | 100 ₹87,000 | 200 ₹1.7 L | 200 ₹1.7 L | 60 ₹52,200 | 60 ₹52,200 |
| 7.00 | Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge. | 150 | Cum | 1,500 ₹2.3 L | 2,200 ₹3.3 L | 2,200 ₹3.3 L | 2,250 ₹3.4 L | 1,800 ₹2.7 L |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 130 | Cum. | 4,600 ₹6.0 L | 6,300 ₹8.2 L | 6,500 ₹8.4 L | 7,000 ₹9.1 L | 5,100 ₹6.6 L |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Foundations, footings, bases of columns, etc. for mass concrete | 640 | Sqm. | 330 ₹2.1 L | 300 ₹1.9 L | 350 ₹2.2 L | 500 ₹3.2 L | 420 ₹2.7 L |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 400 | Sqm. | 550 ₹2.2 L | 600 ₹2.4 L | 550 ₹2.2 L | 500 ₹2 L | 500 ₹2 L |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
10 Aug 2024, 6:00 pmClosed
Sr. Manager
AAI, Puducherry Airport, Puducherry-605 008
Construction of Boundary wall from Maruthi school to crash gate II at Puducherry Airport. SH From North-East to South-East Corner of Runway 25 Side (PHASE - 1)
2024_AAI_201364_1
AAI/PDY/SM(E-C)/Boundary wall Ph-I/2024-25
Open Tender
Civil Works
240 days
AAI, Puducherry Airport
As per Tender Document
9 documents required · 9 mandatory
₹1,180
₹3.8 L
4 Mar 2026
17 Jul 2024
12 Aug 2024
18 Jul 2024
10 Aug 2024
18 Jul 2024
18 Jul 2024 - 6 Aug 2024
Amount
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km a) Lime, moorum, building rubbish
Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km b) Earth
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: a) Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for: a) Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for: a) Columns, Pillars, Piers, Abutments, Posts and Strut : upto plinth level
Centering and shuttering including strutting, propping etc. and removal of form for: a) Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. a) Thermo-Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-Charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. a) All works upto plinth level i) Concrete of M30 grade with minimum cement content of 350 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-Charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. a) All works above plinth level upto floor V level i) Concrete of M30 grade with minimum cement content of 350 kg /cum
Brick work with bricks of class designation 50 in foundation and plinth in: a) Cement mortar 1:6 (1 cement : 6 coarse sand) (Note:River sand/M Sand should conform to requirements given in the relevant IS code 383 (latest revision)).
Brick work with bricks of class designation 50 in superstructure above plinth level up to floor V level in all shapes and sizes in : a) Cement mortar 1:6 (1 cement : 6 coarse sand) (Note:River sand/M Sand should conform to requirements given in the relevant IS code 383 (latest revision)).
Providing and Fixing 75mm dia unplasticised regid PVC pipes confirming to IS:13592 Type A etc. Complete as per Engineer In- Charge. (i) Single socketed Pipes
12 mm cement plaster: a) 1:3 (1 cement: 3 fine sand)
15 mm cement plaster: a) 1:3 (1 cement: 3 fine sand)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. a) Hot finished welded type tubes
Finishing walls with Acrylic Smooth exterior paint of required shade : a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : a)Two or more coats on new work.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Removing and stacking the existing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), up to 5m height of wall, along with 9 horizontal R.B.T. reinforced barbed wire, including unfastening of G.I. staples and G.I. clips, bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge. The item should be stacked properly in bundles so as to enable reuse of the same after construction of the compound wall in that area.
Providing and fixing temporary sheet fencing 3m Height from Ground level, with ISA 65 x 65 x 6mm as vertical members, ISA 50 x 50 x 6mm as horizontal members, connected with nut and bolt arrangement. Vertical members to be fixed at 3m centre to centre and embedded in concrete block of size 60 x 60 x 60 cm. 0.4mm thick colour coated sheet to be fixed with J hook to the horizontal member to form sheet fencing. The temporary fencing should be provided at locations where compound wall is broken for reconstruction as per the security standards and for prevention of animal entry. Once the work is completed, the Sheet fencing should be dismantled. After completion of the whole work, the material will be returned to the agency. The rate shall include materials for the work, excavation of pit for embedding concrete block for fencing post, concreting, loading, unloading, transportation to new location, erection and repetition of process etc. complete as per the direction of Engineer-in-Charge.
RECHI CONSTRUCTION PVT LTD
J.P.M. Building Construction and Interior Works
R.Krishnamurthy and Co
S R NEELAMEGAM
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid