| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 CrAdmitted-Finance B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹6.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.9 Cr+₹10.2 L (1.51%)Admitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | ₹6.9 Cr+₹10.2 L (1.51%) | L2 | Admitted-Finance |
| 3 | L3₹6.9 Cr+₹15.4 L (2.28%)Admitted-Finance | ₹6.9 Cr+₹15.4 L (2.28%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | Jeet Construction L3 | M/s R And C Infraengineers Private Limited L2 | M/S SURYANSH INFRA DEVELOPERS PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stakcing of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 66,000 | Sqm | 25 ₹16,50,000 | 22.22 ₹14,66,520 | 21 ₹13,86,000 Lowest |
| 2.00 | Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 | 46,989.36 | Cum | 185 ₹86,93,031.6 | 181.8 ₹85,42,665.65 | 175 ₹82,23,138 Lowest |
| 3.00 | Construction of earthen shoulder with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.with lead up to 1000m as per MORT&H clause 305 (Sl.No. 3.18) | 5,975.64 | Cum | 185 ₹11,05,493.4 | 182.81 ₹10,92,406.75 | 179 ₹10,69,639.56 Lowest |
| 4.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 7,299.27 | Cum | 2,775 ₹2,02,55,474.25 | 2,768.41 ₹2,02,07,372.06 | 2,740 ₹1,99,99,999.8 Lowest |
| 5.00 | Providing, laying, spreading and compacting graded wet mix macadam (Stablized with Emulsion and Cement) specificatied as in IRC 37-2018 including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers. With emulsion 3.5% and Cement OPC 1% | 2,333.1 | Cum | 7,100 ₹1,65,65,010 | 7,060.91 ₹1,64,73,809.12 | 6,990 ₹1,63,08,369 Lowest |
| 6.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared Bituminous surface cleaned with mechanical broom. as per MORT&H clause 503 (Sl.No. 5.2 ) (for DBM) | 23,331 | Sqm | 12 ₹2,79,972 | 10.1 ₹2,35,643.1 | 10 ₹2,33,310 Lowest |
| 7.00 | Providing and laying dense graded bituminous macadam with TPH computerized type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects. | 1,166.55 | Cum | 9,475 ₹1,10,53,061.25 | 9,510.16 ₹1,10,94,077.15 | 9,410 ₹1,09,77,235.5 Lowest |
| 8.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared Bituminous surface cleaned with mechanical broom. as per MORT&H clause 503 (Sl.No. 5.2 ) (for BC) | 23,331 | Sqm | 11 ₹2,56,641 | 10.1 ₹2,35,643.1 | 10 ₹2,33,310 Lowest |
| 9.00 | Providing and laying bituminous concrete with TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respects | 699.93 | Cum | 10,750 ₹75,24,247.5 | 10,707.01 ₹74,94,157.51 | 10,590 ₹74,12,258.7 Lowest |
| 10.00 | Excavation Earthwork in excavation for as per drawing and technial specification Clause 305.1 including setting our construction of shoring and bracing removal fo stumps and other deleterious material and disposal upto a lead fo 50 m dressing of sides and bottom and backfilling in trenches with excvated suitable material. | 134.41 | cum | 115 ₹15,457.15 | 113.12 ₹15,204.46 | 110 ₹14,785.1 Lowest |
Tender Value
₹6.8 Cr
Closing Date
8 Dec 2021, 12:00 pmClosed
S.E., Prayagraj Circle, PWD, Prayagraj
Office of the S.E., Prayagraj Circle, PWD, Prayagraj
Deviganj bypass marg (ODR) ka nirman karya
2021_CEALD_650573_1
9910/11kamBpraVrit/2021-22 dt. 27-09-2021
Open Tender
Civil Works - Roads
Item Rate
240 days
Kaushambi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,336
Exempted
Prayagraj
7 Jan 2022
3 Dec 2021
8 Dec 2021
3 Dec 2021
8 Dec 2021
3 Dec 2021
4 Dec 2021
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stakcing of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2
Construction of earthen shoulder with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.with lead up to 1000m as per MORT&H clause 305 (Sl.No. 3.18)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded wet mix macadam (Stablized with Emulsion and Cement) specificatied as in IRC 37-2018 including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers. With emulsion 3.5% and Cement OPC 1%
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared Bituminous surface cleaned with mechanical broom. as per MORT&H clause 503 (Sl.No. 5.2 ) (for DBM)
Providing and laying dense graded bituminous macadam with TPH computerized type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared Bituminous surface cleaned with mechanical broom. as per MORT&H clause 503 (Sl.No. 5.2 ) (for BC)
Providing and laying bituminous concrete with TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respects
Excavation Earthwork in excavation for as per drawing and technial specification Clause 305.1 including setting our construction of shoring and bracing removal fo stumps and other deleterious material and disposal upto a lead fo 50 m dressing of sides and bottom and backfilling in trenches with excvated suitable material.
P.C.C. grade M 10 (1:3:6) Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and Mord specification Clauses 802,803,1202, 1203
P.C.C. grade M 15 (1:2:4) Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and technical specification Clauses 802,803,1202, 1203
Brick work M-150 Maslonry work in cement mortar1:3 in foundation complete
Pointing with cement mortar (1:3) on brickwork/ C.R. Stone masonry as per drawing and technical specification Clause 613.3 and 1204
S/l of 1000 mm dia NP-3 H.P. culvert
S/l of 600 mm dia NP-3 H.P. culvert
S/l of 350 mm dia NP-3 H.P. culvert
Providing and lying GSB(Granular material) for beding of hume pipe.
M/s R And C Infraengineers Private Limited
Jeet Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1024602.xls
BOQ • 0.24 MB
sbd.pdf
Additional Documents • 3.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .