| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹8.6 L+₹8,635.34 (1.02%)Rejected-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.6 L+₹17,101.37 (2.02%)Rejected-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹16,932
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 50 Kalyanpur bulakipur mein Mohsin ke Ghar Se Saroj se Mohammed Junaid ke Makan Tak CC sadak AVN nali Nirman karya.
2026_DOLBU_1161224_1
FFC Ward 48 sn 54
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Nagar Nigam Gorakhpur
₹16,932
8 Oct 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI No.692 | 11.59 | Cum | 400 | ₹4,636 |
| 1.02 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. SIN 305A | 26.08 | Cum | 5,817 | ₹1,51,707.36 |
| 1.03 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 course sand including etc. all complete of work. | 126 | Sqm | 159 | ₹20,034 |
| 1.04 | Laying CC In 1:2:4 for top of drain with cement, Course Sand Stone Grit Including supply of all material and Labour etc. | 2.9 | Cum | 8,186 | ₹23,739.4 |
| 1.05 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 17.69 | Cum | 9,082 | ₹1,60,660.58 |
| 1.06 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 11.11 | Qtl | 7,690 | ₹85,435.9 |
| 1.07 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 28.22 | Cum | 3,134 | ₹88,441.48 |
| 1.08 | Consolidation of GSB upto 10 cm loose layer including etc all complete of work. | 28.22 | Cum | 295 | ₹8,324.9 |
| 1.09 | Water allowance to be allowed on above i/c including all complete of work. | 28.22 | Cum | 34.5 | ₹973.59 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_2176427.xls
BOQ • 0.32 MB
d.pdf
Tender Documents • 2.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .