Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.3 CrAccepted-AOC 422 PALLADAM ROAD TIRUPPUR 641 604 | TIRUPPUR | TAMIL NADU | 641604 | ₹59.3 Cr Quoted ₹62.0 Cr | L1 | Accepted-AOC After Negotiation plus four point nine nine percentage excess over the Departmental value |
| 2 | L2₹67.1 CrRejected-Finance 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹67.1 Cr | L2 | Rejected-Finance Plus Eighteen point seven nine percentage excess over the Departmental value for the current year SoR since the tender has been rejected by the Board |
Tender Value
₹56.4 Cr
EMD Value
₹42.3 L
Closing Date
15 Feb 2023, 3:00 pmClosed
The Chief Engineer TWAD Board Coimbatore
The Chief Engineer TWAD Board No30 Siruvani Nagar Bharathipark Road Coimbatore 641 043
Retrofitting of existing CWSS to Muthur and 5 other TPs Vellakoil Kangayam and Dharapuram Municipalities and 1790 rural habitations in Karur Tiruppur and Erode Districts Construction period 12 months Trial Run 3 months and Operation and Maintenance
2023_TWAD_285490_1
IFB24_Retromuthur2ndcall
Open Tender
Civil Works - Water Works
365 days
Tiruppur District
As per Bid Documents Clause 7.1 and 7.2
4 documents required · 4 mandatory
₹0
₹42.3 L
Yes
Coimbatore
8 Apr 2023
2 Feb 2023
16 Feb 2023
2 Feb 2023
15 Feb 2023
2 Feb 2023
2 Feb 2023 - 8 Feb 2023
8 Feb 2023
Replacement of Pipes in Pumping Main and Branch Mains of PSC, AC & PVC with Supply, Delivery, Laying, Jointing & testing of Various size of DI pipes & HDPE Pipes of Pumping Main and Branch Mains and allied works
Replacement of Pipes in Pumping Main from Mettukadai Booster Station to Vellakoil Booster Station of PSC with Supply, Delivery, Laying, Jointing & Testing of MS Pipes and allied works
Replacement of 270 HP of 11500 lpm x 75 m Head HSC Pumpset Unit - II as Supply, Delivery, Erection, Testing and Commissioning of 335 HP Horizontal split casing Centrifugal Pumpsets with duty of 13460 Lpm x 80 m Head and accessories at Mettukadai Booster Station to Vellakoil Booster Station
Operation and Maintenance of entire CWSS for the Period of First 12 Months (i.e., 1 st Year) from the date of Trial Run Completion of the above CWSS
Repairs and Renewals for the Period of First 12 Months (i.e., 1 st Year) from the date of Trial Run Completion of the above CWSS
Operation and Maintenance of entire CWSS for the Period of Second 12 Months (i.e., 2 nd Year) from the date of First Year Maintenance Completion of the above CWSS
Repairs and Renewals for the Period of Second 12 Months (i.e., 2 nd Year) from the date of First Year Maintenance Completion of the above CWSS
VR WATER INFRA COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid