Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance 24 42 1 B BHATAI NEW COLONY NAINI PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | -2.00% | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 L+₹8,250.51 (1.02%)Admitted-Finance | -1.00% | ₹8.2 L+₹8,250.51 (1.02%) | L2 | Admitted-Finance |
| 3 | L3₹8.2 L+₹9,488.09 (1.17%)Admitted-Finance | -0.85% | ₹8.2 L+₹9,488.09 (1.17%) | L3 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹16,500
Closing Date
14 Aug 2026, 12:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD HAPUR
27 - atarpura chaurahe per pandit Jawaharlal Nehru ji ki Murti ke pass marmmat, nale per Jaal avn Apar jiladhikari aawas per floor tiles lagane aadi ka Karya
2026_DOLBU_1170342_27
201/23/PWD/2026-27 Dt. 16-07-2026
Open Tender
Miscellaneous Works
Percentage
120 days
HAPUR
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹944
EO NPP HAPUR
₹16,500
24 Aug 2026
18 Jul 2026
14 Aug 2026
18 Jul 2026
14 Aug 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing dry or oil bound distemper , water proofing cement paint and the like by scraping , sand papering the surface smooth including necessary to scratches etc. complete | - | sqm | 19.22 | - |
| - | 12 mm thick plaster in single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. As per S.i. no. 584 (1:4 with cement and sand mortar) | - | sqm | 265.17 | - |
| - | providing and laying G.S.B. spreading and compacting stone aggregates of specific size including spreading in uniform thickness hand packing ,rolling with three wheel 80-100 kn static roller/ two wheel dynamic roller in stage to proper grade and camber, applying and brooming crushable screening to fillup the interstices of course aggregate. ballast making medhis to retain water and carriage of metal upto 30 m carriage of water upto 200 meter maintanance of barriers and all labours t&p incl. road roller charges etc. required for propr complition of work the stone ballast is to be supplied by the contractor free of cost at site. | - | cum | 3,467 | - |
| - | providing and laying cement concrete 1:2:4 ( 1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) including supply of materials complete all work upto plinth level. | - | cum | 7,630.59 | - |
| - | Stone tile lining work for wall lining upto 10 m height with special adhesive over 20 mm thick bed of cement mortar 1:3 ( 1 cement :3 sand)including pointing in with white cementwith an admixture of pigment to match the stone shade | - | sqm | 2,033.1 | - |
| - | Reinforced cement concrete work in walls (any thickness), including pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) (i) upto plinth level. | - | cum | 8,369.15 | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars | 0.6 | kg | 83 | ₹49.8 |
| - | providing and fixing stainless steel ( grade304) board made with hollow tubes , channels, plate etc. Including welding , grinding , buffing polishing and making curvature and making the same and fitting the same with naccessary stainless steel nut and bolts complete i/c fixing the board with naccessary accesories of required size as per approval of engineer in charge (for payment purpose only weight of stainless steel members shall be consider excluding fixing assecories such as nut , bolts etc.) | - | kg | 590.71 | - |
| - | GST | 18 | Percentage | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.50 MB
TD_201.pdf
Tender Documents • 2.77 MB
BOQ_2196425.xls
BOQ • 0.30 MB
Date.pdf
Additional Documents • 0.27 MB
CorrigendumNIT201.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .