Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC 169 MEENAMBIGAI NAGAR 5TH STREET SUBRAMANIAPURAM MADURAI 625 011 | MADURAI | MADURAI | TAMIL NADU | 625011 | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 LRejected-AOC | ₹4.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹5.3 LRejected-AOC | ₹5.3 L | L3 | Rejected-AOC L3 |
| 4 | -₹4.7 LRejected-AOC 15 KALAINAGAR 3RD STREET MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹4.7 L | - | Rejected-AOC - |
| Sl No | Description | Qty | Unit | RAMAKRISHNAN M L3 | BAVITHRA BUILDERS L2 | RAMAR C L4 | PARIS CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 48 | M3 | 218.4 ₹10,483.20 | 208.6 ₹10,012.80 | 215.44 ₹10,341.33 | 202.35 ₹9,712.74 |
| 2.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cum. thick well rammed and consolidated including watering complying with standard specification etc. complete | 6 | M3 | 2,044.1 ₹12,264.60 | 1,952.8 ₹11,716.80 | 1,947.84 ₹11,687.06 | 1,829.44 ₹10,976.67 |
| 3.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 9 | M3 | 6,190.1 ₹55,710.90 | 5,913.3 ₹53,219.70 | 5,789.11 ₹52,102.01 | 5,437.22 ₹48,935.02 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 92 | M2 | 770.5 ₹70,886 | 736.1 ₹67,721.20 | 1,375.92 ₹1.3 L | 1,292.28 ₹1.2 L |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only | 14 | M2 | 1,450.4 ₹20,305.60 | 1,385.6 ₹19,398.40 | 1,146.6 ₹16,052.43 | 1,076.91 ₹15,076.70 |
| 6.01 | Reinforced Cement Concrete 1:1 1/2:3 (One Cement One and Half sand and Three aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc., | 8 | M3 | 9,490.3 ₹75,922.40 | 9,065.9 ₹72,527.20 | 9,647.57 ₹77,180.54 | 8,622 ₹68,976 |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia | 640 | Kg | 95.7 ₹61,248 | 91.5 ₹58,560 | 95.75 ₹61,278.34 | 47.9 ₹30,656 |
| 8.01 | Plain Cement Concrete 1:2:4 (One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation wher over neceray etc complete. | 13 | M3 | 7,568 ₹98,384 | 7,229.5 ₹93,983.50 | 6,753.56 ₹87,796.32 | 6,343.05 ₹82,459.68 |
| 9.01 | Plastering with C.M.1:3 (one cement and three sand) using 20mm thick, | 17 | m2 | 655.9 ₹11,150.30 | 626.6 ₹10,652.20 | 579.29 ₹9,847.91 | 544.08 ₹9,249.31 |
| 10.01 | Add GST 18% | 1 | GST | 74,946.5 ₹74,946.50 | 71,595.3 ₹71,595.30 | 81,516.68 ₹81,516.68 | 71,087.81 ₹71,087.81 |
Tender Value
₹4.9 L
EMD Value
₹4,897
Closing Date
16 Feb 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Construction of Road Cross Culvert at padapadi Street and Koodalmalai in Ward No.98.
2026_MAWS_651256_1
Z5 / E3 / Est.616 / 25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,897
18 May 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cum. thick well rammed and consolidated including watering complying with standard specification etc. complete
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only
Reinforced Cement Concrete 1:1 1/2:3 (One Cement One and Half sand and Three aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc.,
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia
Plain Cement Concrete 1:2:4 (One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation wher over neceray etc complete.
Plastering with C.M.1:3 (one cement and three sand) using 20mm thick,
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
docss.pdf
Tender Documents • 0.83 MB
BOQ_780930.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid