| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 2 | L1₹6.1 LAccepted-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | KHERI | UTTAR PRADESH | 261501 | L1 | Accepted-Finance LOWEST | |
| 3 | L1₹6.1 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 4 | L2₹8.2 L+₹2.0 L (33.5%)Rejected-Finance | L2 | Rejected-Finance HIGHETS |
Tender Value
₹6.1 L
EMD Value
₹6,100
Closing Date
19 May 2018, 12:00 pmClosed
SE EDC Mathura
Near Kali Mandir, Mathura Cantt, Mathura
Erection/Replacement of PCC Pole in middle of Span at and Replacement of Damaged Arial Bunch Conductor at Radhakund, Jatipura, Goverdhan Town, Anyour and other work due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2018 Under E.D.
2018_DVVNL_203271_1
34/EDC(M)/2018-19
Open Tender
Electrical Works
Item Rate
60 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹720
UPPCL EDC MATHURA
₹6,100
Yes
25 Jun 2020
14 May 2018
19 May 2018
14 May 2018
19 May 2018
14 May 2018
Amount
Carriage of 8.5 Mtrs. long PCC pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 11 Mtrs. long ST pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Replacement of damaged poles 8.5 Mtr. long PCC pole by digging of pits and dismantling of all accessories from the existing / damaged pole and erection of single new pole including fitting all accessories including the cost of labour, T&P etc. required for proper completion of work.
Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure 11 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging stringing and binding of Arial Bunch Conductor 3x120 sq mm on the erected PCC pole/STP including jumphering as per RESPO manual.
Cutting of CC Road for pole and stay by cutting of hard rock with the help of hydraulic machine as per direction of supervising engineer. It including the cost of all labour, T&P etc.
Removal/Dismantling of consumer’s cable service connection from existing line feeding consumer supply.
Re-installation of consumer’s cable service connection from existing line feeding consumer supply.
Chopping of Tree branches to Clear the 11 KV/33 KV line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.
Providing Bamboo sticks suitable for 4 wire on the lade conductors it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work.
Re-sagging of Lose LT Line Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.(work will be done inside and outside of village)
Re-sagging of Lose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.(work will be done inside and outside of village)
Straightening of tilted pole structure on 8.5 Mtr. Long PCC Pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work (inside/outside village)
Dismentling of Arial Bunch Conductor and properly binding and its carriage to J.E. Store from pit site including loading and unloading.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
M/s Sanjay Traders
Shri Krishna Construction Company
M/s Rangeshwar Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .