| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹4.0 L+₹49,210 (14.0%)Accepted-Finance | 2 | Accepted-Finance L-2 | |
| 3 | 3₹4.1 L+₹55,660 (15.8%)Accepted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | 3 | Accepted-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
26 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2023_UPTCL_801446_1
E-TENDER NO. ETC-II/L/04/2023-24
Open Tender
Electrical Works
Item Rate
30 days
132 KV S/s Sareni Under ETD Unnao
AS PER TENDER DOCUMNETS
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹3,600
3 Jul 2023
11 May 2023
27 May 2023
11 May 2023
26 May 2023
11 May 2023
Amount
The following works are carried out for Replacement of Gaskets of 40MVA T/F-1 (BBL make) alongwith other associated Works at 132KV Sub Station Sareni, Raebareli with all Cost of Men, Misc Consumables, Crane / Hydra, Centrifuging Machine, Nomal & Special T&Ps,any other accessory works like cleaning of oil tank (with oil or as required) etc required for satisfactory completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below-
Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc.
Complete Draining of the T/F Oil from the 40MVA Transformer - 1 into Oil Tanker / Oil Drums andStacking them at Proper Place
Complete Dismantling of the 40MVA T/F as required for Gasket Replacement. The Scope of Work Involves Dismantling of HV LV Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe. Buchholz Relay, Oil Pipe Lines. Flanges, Valves, Cooling Fans cc, along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets
Complete Replacement of Gaskets of 40MVA Transformer. The Scope of Work Involves Reolacement of Gaskets Removal of old / damaged Rim Gasket of Transformer's Top Cover and old / damaged gaskets of different Parts of the Transformer by Cleaning of Surfaces, Providing & Fabrication of Gaskcts out of good Quality Rubberized Cork Sheet Gaskets of Konica Troborze / Nu-Cork make having Temperature Bearing Capacity around 380'C and Fixing the Gaskets with Adhesive at Rim & other Surfaces including Bushing 'O' Rings etc. as per requirement.
Clcaning of Transformer's Core and Winding by Hot Transformer Oil and Removing the Complete Sludge from Bottom by Hot oil Flushing with Centrifugine Machine
Complete Erection of 40MVA Transformer - 1 by Erection of HV / LV /Neutral Bushings, Turets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines Flanges, Valves, Cooling Fans etc. at its original Place. Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50'C or better in Vacuum upto Pressure of 0.25K g/cm' and the again Evacuating the Transformer Tank after Required Time Interval (approx, 12 Hrs.) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every Cycle till the Required Value is achieved
Centrifuging of Oil flled in oil Tanker, Un-Interrupted till the desired BDV Value of the Achiraved Oil is Achieved, Filling of Transformer 0il into Main Tank and Radiators from Oil Tanker, then Centrifuging & Circulation of the Oil in Transforer, Un-Interupted till the Desired BDV Values of the Oil & IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 Hours. Centrifuging Machine, its Operator, all associated T&Ps etc. shall be Arranged by the Contractor at his own cost
Jumpering of HV & LV side Bushings of the Transformer. The Scope of Work Involves Fixing &e Tightening of Bushing Clamps with appropriate size Bolts - Nuts - Washers including Reolacement of Clamps, Jumpers etc. as Required
Outside Complete Spray Painting of above 40MVA Transformer including its Main Tank, Main / OLTC Conservator Tanks, Radiators, Headers, associated Pipe Lines, Support Structures, Marshalling Box etc. by 1 coat of Red Oxide Primer and then applying 2 coats of Smoke Grey Colour 1" Quality Synthctic Enamcl Paint of Asian / Berger / Nerolac make at the Gap of 48 Hrs. Interval each with the help of Spray Painting Machine afer due Rubbing & Cleaning of the Rusted Surfaccs, CIeaning & Washing of Dust / Dirt /oil Deposits.
Carriage of 20 KL oil tank from 220 KV S/S Amethi to 132 KV S/S Sareni for purpose of storing of oil after draining from T/F including cost of loading / unloading / transportation/ truck/fuel/driver and any other T&P as required for carriage work.
MANAS ELECTRICALS
Versha and Brothers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .