| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-Finance 234 Z 12 VAISHNO COLONY SURENDRA NAGAR ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹5.2 Cr | L1 | Accepted-Finance Accept L1 |
| 2 | Not Admitted-Fee/PreQual/Technical ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S HARENDRA SINGH L1 |
|---|---|---|---|---|
| 1.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding Reinforcement complete as per Drawaing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000m. (All work shall be carried out as per Morth & Specification 1100 & 1700). The rate is including all testing required as per Merth Specification & also cost of all material, labour, Royalty, ISTP, T&P, Labour cess, and all other taxes but excluding G.S.T | 2,988.5 | Rm | 8,900 ₹2.7 Cr |
| 2.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications (All work shall be carried out as per Mort&h Spefication 1600) The rate is including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 187.65 | MT | 75,900 ₹1.4 Cr |
| 3.00 | Finishing walls with water proof cement paint of approved make and quality on new work with two coat to give an even shade on boundary pillars Rate is including supply of all materials, labour, Tools & plant etc. required for proper completion of the work (660) but for each coat of water proof cement paint after the first two coat to give an even shade. including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 5,673.98 | Sqm | 90.76 ₹5.1 L |
| 4.00 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI Wire Conforming to IS 280 & IS 4826 in 100mmx 100 mm mesh (weaved diagonally) including 10 percent extra for laps and joints laid with stone bouldres weighing not less than 40 kg each. (All work shall be carried out as per Mort&h Spefication 2503) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 2,618.76 | Sqm | 4,087.95 ₹1.1 Cr |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
16 May 2026, 12:00 pmClosed
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
F/Y-2026-27 Construction of RCC Boundary pillars to be installed on the Uttar Pradesh and Haryana state Border
2026_CEALG_1145476_1
2422-Cashier (P.D.A)-A.C-26-27 dt-17.04.2026
Open Tender
Civil Works - Bridges
450 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹11.0 L
Yes
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
11 Jun 2026
5 May 2026
16 May 2026
5 May 2026
16 May 2026
5 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bored cast-in-situ M35 grade R.C.C. pile excluding Reinforcement complete as per Drawaing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000m. (All work shall be carried out as per Morth & Specification 1100 & 1700). The rate is including all testing required as per Merth Specification & also cost of all material, labour, Royalty, ISTP, T&P, Labour cess, and all other taxes but excluding G.S.T | 2,988.5 | Rm | - | - |
| 2 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications (All work shall be carried out as per Mort&h Spefication 1600) The rate is including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 187.65 | MT | - | - |
| 3 | Finishing walls with water proof cement paint of approved make and quality on new work with two coat to give an even shade on boundary pillars Rate is including supply of all materials, labour, Tools & plant etc. required for proper completion of the work (660) but for each coat of water proof cement paint after the first two coat to give an even shade. including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 5,673.98 | Sqm | - | - |
| 4 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI Wire Conforming to IS 280 & IS 4826 in 100mmx 100 mm mesh (weaved diagonally) including 10 percent extra for laps and joints laid with stone bouldres weighing not less than 40 kg each. (All work shall be carried out as per Mort&h Spefication 2503) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 2,618.76 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.40 MB
BOQ_2141252.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid