| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC Lowest rate |
| 2 | L2₹2.4 LRejected-Finance | ₹2.4 L | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | Kather meeran L2 | Nithish Kumar L1 |
|---|---|---|---|---|---|
| 1.00Maintenance of Auditorium | |||||
| 2.00 | Earth work excavation for foundation in all soil and sub soils and to full depth as may be directed excepet in rock requiring blasitng but inclusive soring,strutting and hailing out water wherever necessary and refilling side of foundation with excavated earth in layers of not more than 15cm | 4.88 | Cum | 273 ₹1,332.24 | 263.6 ₹1,286.37 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal Including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc complete for 10 cum | 3.18 | Cum | 5,341 ₹16,984.38 | 5,331 ₹16,952.58 |
| 4.00 | Cement concrete 1:1.5:3 ISS HBG metal for all RCC item of work excluding cost of reinforcement and fabrication charges centering and shuttering but including curing and providing fixtures like fan clamps in rcc floors | 5.6 | Cum | 9,113 ₹51,032.80 | 9,103.6 ₹50,980.16 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 8 3/4"x 4 1/4"x 2 1/4" for following incluing curing etc. | 0.37 | Cum | 6,133 ₹2,269.21 | 6,123.7 ₹2,265.77 |
| 6.00 | Supply and fabrication of steel including cost and conveyance of bending to shape and tying in position and farming grills for all RCC works including cost and conveyance of all materials to site and all labour charges | 0.28 | Cum | 92,000 ₹25,760 | 91,858 ₹25,720.24 |
| 7.00Maintenance of Auditorium | |||||
| 8.00 | column | 9.11 | Cum | 1,105 ₹10,066.55 | 1,095 ₹9,975.45 |
| 9.00 | Grade beam | 10.19 | N | 557 ₹5,675.83 | 547.3 ₹5,576.99 |
| 10.00 | above basement | 20.72 | n | 1,105 ₹22,895.60 | 1,095 ₹22,688.40 |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
18 Dec 2025, 4:00 pmClosed
BDO (B.pt), Radhapuram
Block Development Office, Radhapuram
Construction of boys toilet at Samugarengapuram Udhayamarthanda vinayagar koil opposite in Samugarengapuram Panchayat in Radhapuram Panchayat Union
2025_RDTN_630286_1
General Fund 2025-2026
Open Tender
Civil Works
Block Development Office, Radhapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,500
23 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
Amount
Maintenance of Auditorium
Earth work excavation for foundation in all soil and sub soils and to full depth as may be directed excepet in rock requiring blasitng but inclusive soring,strutting and hailing out water wherever necessary and refilling side of foundation with excavated earth in layers of not more than 15cm
Cement concrete 1:4:8 mix using 40mm ISS metal Including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc complete for 10 cum
Cement concrete 1:1.5:3 ISS HBG metal for all RCC item of work excluding cost of reinforcement and fabrication charges centering and shuttering but including curing and providing fixtures like fan clamps in rcc floors
Brick work in CM 1:5 mix using country bricks ground moulded of size 8 3/4"x 4 1/4"x 2 1/4" for following incluing curing etc.
Supply and fabrication of steel including cost and conveyance of bending to shape and tying in position and farming grills for all RCC works including cost and conveyance of all materials to site and all labour charges
Maintenance of Auditorium
column
Grade beam
above basement
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg per sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints nearly complying with the std spec
Dadooing wall with Glazed tiles of any colour of any size laid in CM 1:2 10mm thick and pointing ith white cement 0.4kg per sqm mixed with colouring pigment to siut the colour of the std specification and as directed by departmental officers
plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges
Plastering with cement mortar 1:3 mix to 10mm thick including
Esterior emulsion painting two coats with best approved quality and colour paint over one coat of base coat including cost and conveyance of all materials to work site and labour charges eyc
Suppply of steel doors,windows,ventilators etc.,with best approved quality etc.,complte complying with std specification and as directed by departmental officers
Door D1(1.00x2.10)m
Door D10.75x2.1)m
Rcc Jolly 0.60x0.45
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges
Labour charges for fixing the door including all charges
Supplying and fixing of indian water closet including all cost
Supplying and fixing of Europen water closet including all cost
Kather meeran (BID ID -1537748)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_753691.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_753691.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid