| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC 37 2 KARUMALAIKODA CHINNAIYA REDDY STREET METTUR R S PO 636 402 | METTUR | SALEM | TAMIL NADU | 636402 | ₹14.5 L Quoted ₹15.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | PV Power Tech L1 |
|---|---|---|---|---|
| 1.00Work contract schedule | ||||
| 1.01 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 100 | Each pit | 450 ₹45,000 |
| 1.02 | Stay pit 4.5' to 5' depth by using JCB or manual | 80 | Each pit | 450 ₹36,000 |
| 1.03 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by
using JCB or manual | 50 | Each pit | 550 ₹27,500 |
| 1.04 | Hard rock without blasting (Where houses are located)upto 27inch | 10 | Each pit | 1,500 ₹15,000 |
| 1.05 | Hard rock without blasting (Where houses are located)upto 9m and above | 10 | Each pit | 1,500 ₹15,000 |
| 1.06 | Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or
manual | 100 | Each pole | 550 ₹55,000 |
| 1.07 | Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or
maual | 70 | Each pole | 650 ₹45,500 |
| 1.08 | Erection of stay set complete | 80 | Each Stay | 240 ₹19,200 |
| 1.09 | Fixing of HT/LT TI Fittings | 80 | Each | 70 ₹5,600 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
21 Nov 2025, 11:00 amClosed
SE/MEDC/METTUR
O/o SE/MEDC/METTUR
works for effecting services in various schemes in Pappampady section in Omalur division
2025_EB_621012_1
SE/MEDC/AEE/MM/MTR/Spec No.045/25-26
Open Tender
Electrical Works
365 days
Mettur EDC
EMD And Document as per BQR Contions
2 documents required · 2 mandatory
₹0
₹15,000
28 Jan 2026
7 Nov 2025
21 Nov 2025
7 Nov 2025
21 Nov 2025
7 Nov 2025
7 Nov 2025 - 21 Nov 2025
Amount
Work contract schedule
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Hard rock without blasting (Where houses are located)upto 27inch
Hard rock without blasting (Where houses are located)upto 9m and above
Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Erection of stay set complete
Fixing of HT/LT TI Fittings
Fixing of HT 'V' X arms/ Channel X arms,Guarding X arms
Fixing of HT Pin Insulators - 22 KV
Fixing of HT 11 KV Strain disc
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of LT Pin insulators
Fixing of Shackle
Fixing of Aluminium Knob
Paving , Stringing, Binding & Jumpering of ACSR 7/4.09 mm
Paving , Stringing, Binding & Jumpering of ACSR 7/3.35 & AAAC 7/3.15 mm
Paving , Stringing, Binding & Jumpering of ACSR 7/2.59 mm & ACSR 7/2.11 mm AAC 7/2.50
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering) PCC 1:3:6 with 20mm HBG
Transport of poles/Materials/ Conductors (Excluding loading & Unloading charges) Below 8 Kms
Loading of line materials
Unloading of line materials
Loading of PSC poles 8M & 9.14m
Unloading of PSC poles 8M & 9.14m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Labour charges for alteration of Back clamp
Labour charges for alteration of Stay clamp
Labour charges for Cutting a full grown tree (all type of trees) & removing out of the loc. In full
Labour charges for Drilling of hole in channel only 3/4" & 1" per hole
Labour charge for Cutting of Channel/ Angle/Flat
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Loading or unloading of Transformer above 63KVA and upto 250 KVA
Erection of New Transformer all capacities (with jumpering)
Earthing of pole with coil earthing including burying looping and binding.
Dismantling of Pole 8.0 Mtr
Releasing of grills from RCC Poles
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Dismantling of HT V Cross arms(all type)
Dismantling of HT 22KV Pin Insularors
Dismantling of HT 22KV Strain Disc
Dismantling of LT 1 PH X arm
Dismantling of LT 3 PH X arm
Dismantling of LT Shackle
Dismantling of LT Pin insulators
Dismantling of Alu Knob
Dismantling of Stay set complete
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm & 7/2.11mm conductor
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.18 MB
BOQ
BOQ • 0.30 MB
Download all tender documents and submit your bid